The Project Plan And Cost Calculations Will Be Made From Three Different Visions Of Piikkiö Unified School: Renovation, Demolition And New Building, And Their Hybrid. The End Result Should Be Reliable Information On The Cost, Service Life And Risks And Opportunities Of Implementation. The Options Should Be Brought To A Comparable Form For Decision -Making. As Part Of The Project Plan, You Should Also Be Processed In Cooperation With The User And The Developer The Status Program And The Functional Requirements Document For The Actual Design As A Guideline For The Desired Outcome. The Document Must Indicate The Desired Result Of Both The Technical And Pedagogical Aspects. This Invitation To Tender Is Accompanied By Sketches Of Both Documents. This School Building Has Severally Expanded Partially Brick -Lined And Partially Plastered School Building, The First Parts Of Which Were Completed In 1957. 2 And Volume 27850M^3. The Site Has Three Floors, The Number Of Floors Varies By Building. The Site Has Basements Below The Ground In 1957, 1972 And In Parts Completed In The 20Th Century. In Addition, The Technical Tunnels Leading Outside The Site, An Old Oil Tank And Heating Technology Tunnels. There Are Basic Education Classes 1-9 At School. In Addition, The Building Has Special Classes And Pre -School Education. The Sports Hall On The Same Plot As The School Entity Is Not Covered By The Space Program (Considering That The Primary Sports Facilities Serving The School Are In The Sports Hall). The New Building Option Must Check How The New Building Could Be Located On The Site So That The Current School Could Work To Introduce The Building. You Must Also Apply For A Formula Exception Application For This Purpose. The Renovation And The Hybrid Model Must Look At What And The Size Of The Evacuation Facilities The Students Need And Take Into Account Their Costs. At The Same Time, It Is Necessary To Look At How Demolition Is Possible So That Students Are Safely Studying And Outdoors On The Same Site. The Project Plan Group Consists Of An Architect, A Structural Designer, A Hvac Designer, An Electrical Designer, A Cost Calculator, A Fire Technical Consultant/Designer, A Geo Designer And A Construction Health Expert (Rta). The Requirements Of Each Person Are Described In More Detail In The Aptitude Requirements And The Criteria For The Site. The Architect Also Serves As A Chief Designer. The Project Plan Must Be Completed On 5.8.2025. The Work Schedule Must Take Into Account That Users Are On Holiday In Accordance With School Holidays. Terms Of Contract Kse2013. The Subscriber Requires That The Tenderer Has Visited The Destination And Thus Cannot Rely On Lack Of Input Data Or Their Position. The Item Has Not Been Modeled And Only Has Indicative Pdf Formulas. Plans Are Often On A Paper Version And Stored In Different Locations. In The Context Of A Fitness Survey, Efforts Have Been Made To Find Out The Structures And The Structure. The Study Is Attached To This Invitation To Tender. You Can Visit The Site By Contacting The Construction Engineer Elina Tirkkonen (@Kaarina.Fi) / 040 562 6827 On The Day 24.2.25 At 9 Or 26.2.25 At 3 Pm . This Must Be Taken Into Account When Reading The Task Cards. At The Same Time, Changing The Heating System Should Also Be Examined. The Heating System Based On Geothermal Heat Should Be Examined And Dimensioned. Currently, The Building Is Heated By Pellet And Oil (Backup System). The Examination Of The Heating System Must Take Into Account The Adjacent Sports Hall, Which Has A Common Heating System With The School Building.
Contact Information
Address
Lautakunnankatu 1
Email
hankinnat@kaarina.fi
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 92218629
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.