Purchase And Installation Of Equipments Of Equipments For Open Gym For Ladies In Eravathur Chirapark , Gym Equipments , Walker Single- Providing And Fixing Walker Single- Using, Minimum 100 Nb Gi C-Class Pipe- For Main Frame, Minimum 32 Nb Gi B-Class Pipe- For Leg Frame, Minimum 25 Nb Gi B-Class Pipe For Handle Frame, Nylon 66 Injection Moulded Casingclamps, Lldp Rotomoulded Seat With Inbuilt Bolts 3/8" X 1.5" Footrest, Nylon 66 Injection Moulded Bearing Cap & Pipe Cap, Fully Doneby First Coat Of Primer – Jotun Brad 40-50 Micron Thickness And Top Coat Of Pure Polyester Powder With 70- 80 Micron Thickness Powder Coatincluding Cost Of Concrete Foundation , All Materials, Labour,Etc All Complete Asper The Instruction Of Engineer In-Charge , Rider- Providing And Fixing Rider - Using, Minimum 100 Nb Gi C-Class Pipe- For Main Frame, Minimum 32 Nb Gi B-Class Pipe For Seat Frame, Minimum 40 Nb & 25 Nb B Class Gi B-Class Pipe For Handle Frame, Minimum 32Nb & 25Nb Gi B-Class Pipewith Two Handles For Leg Rest, Lldp Rotomoulded Seat With Inbuilt Bolts3/8" X 1.5" For Foot Rest & Seat Rest, Nylon 66 Injection Mouldedbearing Cap & Pipe Cap, Fully Done By First Coat Of Primer – Jotun Brad 40-50 Micron Thickness And Top Coat Of Pure Polyester Powder With 70-80 Micron Thickness Powder Coat Including Cost Of Concretefoundation , All Materials, Labour,Etc All Complete Asper The Instruction Of Engineer In-Charge , Chest Press Cum Shoulder Press- Providing And Fixing Chest Presscum Shoulder Press - Ffe007 (Make Fun Play )Using, Minimum 100 Nbgi C-Class Pipe For Center Frame, Minimum 40 Nb & 32 Nb Gi B-Classpipe For Main Frame, Minimum 32 Nb & 25 Nb Gi B-Class Pipe Forhandle Frame, Minimum 32 Nb & 25 Nb & 40 Nb Gi Bclass Pipe For Connecting Pipe, Lldp Roto Moulded Seat With Inbuilt Bolts 3/8" X 1.5"For Seat & Back Rest, Nylon 66 Injection Moulded Bearing Cap & Pipecap, Fully Done By First Coat Of Primer – Jotun Brad 40-50 Micronthickness And Top Coat Of Pure Polyester Powder With 70- 80 Micronthickness Powder Coat Including Cost Of Concrete Foundation , All Materials, Labour,Etc All Complete Asper The Instruction Of Engineer In- Charge , Ski Trainer- Providing And Fixing Ski Trainer -Using, Minimum 100 Nb G.I. C Class Pipes For Main Frame, Minimum 40 Nb G.I. Pipe For Foot Rest Pipe, Minimum 40Nb & 25 Nb G.I. Pipe Forhandle, Minimum 25 Nb & 40 Nb Gi B-Class Pipe For Connectingpipe, Lldp Rotomoulded Seat With Inbuilt Bolts 3/8" X 1.5" For Footrest, Nylon 66 Injection Moulded Bearing Cap & Pipe Cap, Fully Doneby First Coat Of Primer – Jotun Brad 40-50 Micron Thickness And Top Coat Of Pure Polyester Powder With 70- 80 Micron Thickness Powder Coat Including Cost Of Concrete Foundation , All Materials, Labour,Etc All Complete Asper The Instruction Of Engineer In-Charge , One Seating Cum 2 Standing Twister- Providing And Fixing Tai Chicum Twister -Using, Minimum 100 Nb Gi C- Class Pipe For Main Frame, Minimum 25 Nb Gi B-Class Pipe For Handle Frame, Lldp Rotomoulded Seat With Inbuilt Bolts 3/8" X 1.5" For Twister Disc, Minimum 25 Nb & 20 Nb Gi B-Class Pipe For Seatingframe, Minimum 80 Nb Gi B-Class Pipe For Seating Frame Stand,Minimum 80 Nb Gi B-Class Pipe For Twister Stand, Minimum 25 Nb Gi B-Class Pipe For Twister Handle Frame, Lldp Plastic- Twister Disc, Nylon 66 Injection Moulded Bearing Cap & Pipe Cap, Fully Done By First Coat Of Primer – Jotun Brad 40-50 Micron Thickness And Top Coat Of Pure Polyester Powder With 70- 80 Micron Thickness Powder Coat Including Cost Of Concrete Foundation , All Materials, Labour,Etc All Complete Asper The Instruction Of Engineer In-Charge , Pendulum- Providing And Fixing Pendulum - Using, Minimum 100 Nb Gi C-Class Pipe For Main Frame, Minimum 40Nb Gi B-Class Pipe For Leg Frame, Minimum 25 Nb & 32 Nb Gi B-Class Pipe For Handle Frame, Lldp Rotomoulded Seat With Inbuilt Bolts 3/8"X 1.5" For Foot Rest, Nylon 66 Injection Moulded Bearing Cap & Pipe Cap, Fully Done By First Coat Of Primer – Jotun Brad 40-50 Micron Thickness And Top Coat Of Pure Polyester Powder With 70- 80 Micron Thickness Powder Coat Including Cost Of Concrete Foundation , All Materials, Labour,Etc All Complete Asper The Instruction Of Engineer In- Charge , Abb Trainer- Providing And Fixing Abb Trainer - Using, Minimum 80 Nb Gi B-Class Pipe For Main Frame, Minimum 32 Nb Gi B-Class Pipe For Side Frame, Minimum 25 Nb G.I. Pipes Forintermediate Pipe, Nylon 66 Injection Moulded Bearing Cap & Pipecap, Fully Done By First Coat Of Primer – Jotun Brad 40-50 Micronthickness And Top Coat Of Pure Polyester Powder With 70- 80 Micronthickness Powder Coat Including Cost Of Concrete Foundation , All Materials, Labour,Etc All Complete Asper The Instruction Of Engineer In- Charge , Cycle- Providing And Fixing Cycle - Using, 25 Nb & 40 Nb Gi B-Class Pipe For Main Frame, 32 Nb Gi B-Class Pipe For Seatframe, 25 Nb Gi B-Class Pipe For Handle Frame, Nylon 66 Injectionmoulded Bearing Cap & Pipe Cap, Fully Done By First Coat Of Primer –Jotun Brad 40-50 Micron Thickness And Top Coat Of Pure Polyesterpowder With 70- 80 Micron Thickness Powder Coat Including Cost Of Concrete Foundation , All Materials, Labour,Etc All Complete Asper The Instruction Of Engineer In-Charge , Bench With Fix Weight- Providing And Fixing Bench With Fix Weight -Using, 100 Nb G.I C-Class Pipe For Main Frame, 32 Nb G.I B-Class Pipe For Bench Frame, 20 Nb G.I B-Class Pipe For Handleframe, Fully Done By First Coat Of Primer – Jotun Brad 40-50 Micronthickness And Top Coat Of Pure Polyester Powder With 70- 80 Micronthickness Powder Coat Including Cost Of Concrete Foundation , All Materials, Labour,Etc All Complete Asper The Instruction Of Engineer In- Charge
|