Tramway Platforms Construction Work-Tramline 50 Plaron Renovation, Phase Ii. In This Project, Tram Line 50 Between Határ Út And Szarvas Csárda Tér Stops, Stopping Stops Left Out Of Previous Construction To Ensure The Transport Of New Low Floor Vehicles In Accordance With The Requirements Of Accessibility. The Contracting Authority States That The Material Implementation Permit Is Required To Constitute A Construction Investment. In Addition To The Stops, Some Other Developments And Track Renovation Are Part Of The Task. The Stops To Be Rebuilt: H1 - Corvin Boulevard H2 - Lehel Utca H3 - Kunner Street (Consolidation Of Lajosmizsei Dirty And Tinódi Street Stops) H4 - Margó Tivadar Utca H5 - Kemény Zsigmond Street H6 - Thököly Street The Necessary Substructure Repair And Track Control Work Must Also Be Carried Out By Replacing The Bedding, Rails And Switching Agents. Az Érintett Szakaszok Gyalogos És Útátjárói, Illetve Vágányvíztelenítési Berendezései Újjáépítendők. A Peronokon Új Peronberendezések, 0,4 Kv-Os Áramellátás És Részben Új Világítás Épül. A Felsorolt Megállók Környezetében A Párhuzamos Út És Járdák Felújítandók. A Villamosmegállók Mellett Lévő Autóbuszmegállók Szintén Átépülnek. A Peronokra Vezető Gyalogátkelők Helye Egyes Helyeken Változik, Egyes Gyalogátkelők Megszűnnek És Újak Épülnek. Minor Corrections Are Required At The Affected Traffic Lights. A New Traffic Light Regulation Is Being Built At The Node Of Üllői Street. Short Sections Of The Affected Utilities Are Required At Multiple Stops: • Gas Pipeline • Water Pipeline • Rainwater Drainage • Public Lighting • Elme 0.4 Kv Network • Nsn-Trafficom Network • Digi Network • Renew Also Part Of The Project. The Main Tasks To Be Performed During The Project Are Summarized: • 6 Stops, A Total Of 12 Plants By Demolishing Existing Furnishings And Placing New Ones • Track Control On Sections Between Sections In The Plans (1 022 Vm) • Establishment (5 Sub-Meters) • Building A 0.4Kv Measuring Network On The Platforms (Column Adjustment: 6 Pcs) • Rebuilding Existing Platform Lighting, Creating A New Platform Lighting (Lamp Post Statement: 49 Pcs) • Rebuilding Existing Public Lighting, Construction Of New Public Lighting ( : 13 Pcs) • Replacement Of Nsn-Trafficom Telecommunication Network (460 M) • Road Construction (Construction Of 130 M3 Rolled Asphalt Layer) • Sidewalk Construction (40 M2) • Rainwater Drainage Network (143 Fm) • Plumbing Construction On Corvin Boulevard, Lehel Street, Margó Tivadar Street And Thököly Road Stop (107 M) • Gas Pipeline Replacement In The Vicinity Of Corvin Boulevard And Lehel Street Stops (215 Fm). • Food Cut (15 Pcs), Installation Of New Ones (52 Pcs) Green Space Arrangement With 3 Year Aftercare (528 M2) • Supplemental Design As Much
Contact Information
Contact No.
+36 307741267
Email
kozbeszerzes@bkk.hu
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 92124701
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.