Part 1: Thermomodernization Of The Building Of Primary School No. 1 In Pieszyce At Ul. Ogrodowa As Part Of The Project Entitled The Modernization Of Public Buildings In The Pieszycezazakres Works Of Works Includes In Particular: • Obtaining The Required Permits/Consents For The Implementation Of The Task, If They Are Required, • Delivery Of Building Equipment And Materials To The Area Of Construction Works, Necessary To Carry Out The Designed Works, • Insulation Of Construction Partitions , Including Insulation Of External Walls, Attic Ceiling And Flat Roofs, • Replacement Of External Door Joinery, • Replacement Of Window Joinery (Including Roof Windows) Together With The Installation Of External Blinds, • Replacement Of Central Heating Installation. Along With The Insult Of A Warm Source Into A Ground Heat Pump, • Construction Of A Hot Water Installation, • Construction Of A Solar Installation, • Replacement Of Lighting Fittings For Energy -Saving Led Luminaires, • Mechanical Ventilation, • Execution Of Construction Auxiliary Work (Puncture, Assembly Holes, Installation Crossings Through Partitions Construction, Filling Of Holes And Reproduction And Repair Of Some Damaged Expeditions (Finishing Elements) During Construction Works), • Execution Of Reproductive And Renovation Works Inside And Outside The Building After The Abovementioned Robots, • Execution Of Cleaning Works Aimed At Bringing The Object And The Area Around It To Its Original State. The Works Of The Works And The Order Of Implementation Of Individual Works Thermomodernization Of The Sp1 Building: • Insulation Of Building Partitions Including External Walls, Attic Ceiling, Flat Roofs • Replacement Of Window Joinery, • Replacement Outer Door Joinery, • Execution Of The External Facade Of The Building, • Execution Of Replacement And Renovation Works Inside And Outside The Building After The Abovementioned Robots. - In The Scope - Installation Of Central Heating And Hot Utility Water: • Making Vertical Wells Under The Lower Heat Source, • Execution Of The Lower Heat Source, • Dismantling Of An Existing Boiler And Elements Of The Existing Central Heating Instance, • Installation Of Heat Mistake, • Assembly Of New Radiators And Assembly Of New Radiators And Assembly Central Heating Installation Cables, • Distribution Of Central Heating And Hot Water Instance In The Building, • Installation Of Accessories And Fittings, Including Protective, • Finishing Works, • Conducting Attempts At The Entire Installation And The Necessary Measurements. • - In The Scope - Replacement Of Lighting Fittings: • Disassembly Of Existing Lighting Fittings, Assembly Of New Led Energy -Saving Luminaires With The Necessary Electrical Installation, • Carrying Out The Necessary Measurements. Arranging Dc Dc Cable Routes And Ac Alternating Current, • Inwerter Assembly, • Installation Of Dc And Ac Switchgears, • Plinding The Pv Installation To The Existing Electrical Installation, • Conducting Trials Of The Entire
|