Building Construction Work - “Works Of Rehabilitation And Modernization Of The Public Buildings In Which Are The Headquarters Of The School For Inclusive Education” Sf. Vasile Craiova, Within The Smis Code Project: 318435. The Purpose Of Carrying Out This Procedure Is To Award The Contract For The Execution Of The Works For The Investment Objective: “Rehabilitation And Modernization Of The Public Buildings In Which The Headquarters Of The School Center For Inclusive Education Vasile Craiova, Buildings Located Dr. Dimitrie Gerota, No.3, Are Located, No.3, No.3, No.3, No.3, No.3, No.3, Craiova, Dolj County ”, Smis: 318435. The Object Of The Contract Is The Execution Of All The Necessary Works To Achieve The Investment Objective:“ The Rehabilitation And Modernization Of The Public Buildings In Which The Headquarters Of The School Center For Inclusive Education Vasile Craiova, Buildings Located In Dr. Dimitrie Street Are Located Gerota, No.3, Craiova, Dolj County ”, Smis: 318435, Provided In The Technical Documentation (Written Parts And Drawn Parts). The Project Is Funded By The South -West Regional Program Oltenia 2021-2027, Priority 3 - Energy Efficiency And Green Infrastructure, Specific Objective 2.1/B (I) - Promoting Energy Efficiency Measures And Reducing Greenhouse Gas Emissions, According To Contract Of Financing No.79/13.08.2024. By Achieving The Objective Rehabilitation And Modernization Of The Public Buildings In Which The Headquarters Of The School Center For Inclusive Education Vasile Craiova, Buildings Located In Dr. Dimitrie Gerota, No.3, Craiova, Dolj County Are To Improve The Educational Conditions, Increase, Increase, Energy Efficiency And Ensuring An Appropriate Level Of Performance In The Case Of Exceptional Actions, All With The Reflection In Low Costs With The Utilities, After Carrying Out The Interventions Of The Investments Proposed In The Award Documentation. The Main Categories Of Works That Will Be Carried Out According To Scenario Ii - The Maximum (Recommended) Variant Are: - The Rehabilitation And Modernization Of The Existing Bodies: C1, C2, C4, C7; - Making The Interventions On The Structure Side; - Thermal Insulation Of The Facades With 15 Cm Thermosystem Of Basalt Wool; - Thermal Insulation Of The Foundation And Socket Of The Existing Building And Proposed With 10 Cm Extruded Polystyrene; - Thermal Insulation Above The Last Level With Stiff Basalt Tiles Of 30 Cm; - Thermal Insulation Of The Interior With The Basalt Wool Of 8 Cm, And On The Outside With The Mw30 Stiff Mineral Wool 15 Cm Thick; - The Realization Of The Proposed Installations For Rehabilitation And Modernization According To The Installations; - The Creation Of The Floors According To The Destination Of The Buildings And According To The Architectural Floors; - Making The Final Finishes For Floors According To The Specifics Of The Rooms: Package, Ceramic Tiles, Lvt - Tarkett Floors; - Making The Facades Using Decorative Plastering Having The Colors According To The Architectural Floors. Making The Portions Of Ventilated Facade Plated With Stratified Wood, Treated, Painted. Brown; - Replacement Of Existing Inner Carpentry For Bodies That Are Rehabilitated With Mdf Or Aluminum Carpentry; - Replacing External Exterior Joinery With Carpentry From Profiles In
|