Road-Repair Works-Renovation, Maintenance And Construction Of Public Roads. Budapest Capital Xiii. The Construction And Maintenance Of New Roads And Accessories, As Well As The Construction And Maintenance Of New Roads, Sidewalks, And The Construction Of Pedestrian Crossings. The Framework For The Framework Contract For 18 Months: $ 1,950,000,000. The Contracting Authority Is Entitled To Unilaterally Assert A Quantitative Difference Of -30% From The Amount, Ie It Undertakes 70% Of The Amount. In The Event Of An Extension Of The Contract, Another Huf 1.95 Billion Will Be Opened For The Extension Period, And The Contracting Authority Is Entitled To Use The Amount Not Used In The First 18 Months During The Extension Period. The Framework Agreement Shall Be Concluded For A Fixed Period Of Time, At Least 18 Months, But Not More Than 36 Months, As Set Out In The Bt-57 Field. The Contract Is The Subject Of The Contract, Primarily, But Not Exclusively, In Budapest, Xiii. The Construction, Renovation, Maintenance, Construction Of The Construction, Renovation, Maintenance, Construction Of The Road, Cycling, Pedestrian And Bench Surfaces And Spaces In The Administrative Area Of The District, As Well As The Related Licensing (Commissioning) Tasks. In Addition, The Construction, Renovation, Maintenance, Construction (Installation) Of Roads, Bicycle Paths, Sidewalks, Squares Related To Roads, Bicycle Paths, Sidewalks, Space And The Related Licensing Tasks. In Addition, The Maintenance Of Drinking Water And Sewage Network Related To Road Construction And Rainwater Drainage Should Also Be Carried Out. The Successful Tenderer Must Also Undertake The Repair Of The Asphalt Pavement To Be Implemented By Infrachte Technology And On-Site Recycling Technology. Total Road Network Length: 102 Km. During The Contract Period, The Following Quantities Of Construction Work Are Expected: - Road Construction Or Road Renovation Work: 40 Km Long Road Network; -Infratic Technology Asphalt Repair Work: 2000 M2; -Paved Pavement Pavement Making Work: 12,000 M2; - Edging Work: 10,000 Fm; - Asphalt Pavement Construction: 36,000 M2; - Turnover Painting Work: 6.800 M2; - Work Related To A Micromobility Tool (Electric Bicycle, Roller, Etc.) Related Work (Construction Of Storage, Construction, Paintings, Placement Of Boards): 55 Pcs; - Installation/Construction Of Anti -Parking Columns: 1580 Pcs; - Construction Of Pedestrian Crossings, Placing 15 Pcs; - Grassing Between Roads And Sidewalks With Humus Spread: 12.700 M2. It Is An Appendix To The Documentation. The Contracting Authority Is Entitled To Order The Necessary Maintenance Work, Which Is Necessary During The Contract Performance Period, Related To The Subject Matter Of The Contract And Can Be Financed From The Amount, Which Is Made By The Itemized Task List (Unit List)
|