Construction Work For Art And Cultural Buildings Modernization Stadthalle Magdeburg, Heinrich-Heine-Platz 1, 39114 Magdeburg, Los 502-Outside Facilities. The State Capital Magdeburg, Represented By The Own Company Of Municipal Building Management (Kgm), Is Planning A Fundamental Modernization Of The Magdeburg Town Hall. The Stadthallenens Ensemble Is Classified As A Monument By The State Office For Monument Preservation. The Basic Objectives Of The Modernization Are: · Upgrading The Listed Existing Building With Regard To Its Residence And Usage Qualities · Ensuring The Building Regulations Law Requirements For Security, Especially With Regard To Fire Protection · Reconstruction Of The Building Cubature In Accordance With The Original Design Idea · Optimizing The Management Options Of The City Hall, In Particular By : - Improvement Of The Delivery Situation For The Stage Of The Large Hall - Improvement Of The Visibility On The Stage In The Large Hall - Renewal Of Building Technology And The Event Technology - Expansion Of The Offer Of Flexibly Usable Event And Conference Rooms - Renewal Of Kitchen Areas - Energetic Upgrading Of The Building Envelope Taking Into Account The Requirements Of Monument Protection · Development Of A Lighting Concept For Improving The External Impact In Urban Areas In The Urban Area · Improvement Of External Qualities (Dismantling Of Various Existing Buildings) · Creation Of Effective Flood Protection -------------------- ------------------ Essential Services-Lot 502 Outdoor Facilities: 511 Top-Floor Work ~ 160 M³ 531 Paths Earthwork-> Boden/Fels Solve ~ 1,650 M³, Planned Connection = Down ~ 360 M³, Produce Order ~ 360 M³-> Layer -> Frost Protection Layer ~ 450 M³, Gravel Application Layer ~ 2,300 M², Drainer Application Layer ~ 1.220 M², Material Construction Pit ~ 305 M³, Mastery Matting ~ 360 M² Fastening -> Make Clinker Brick ~ 1.150 M², Clinker Bracket ~ 530 M, Large Plaster ~ 2.070 M², Mosaic Pavement ~ 220 M², Rectangular Plaster ~ 20 M², Asphalt Cover Layer Ma 8N ~ 30 M² Edging-> Produce Borders ~ 330 M Stairs-> 36 M 533 Places And Farms Develop- > Order ~ 100 M³, Removal ~ 2.270 M², Planned Connection = Removal ~ 280 M³, Produce Order ~ 280 M³ Support Layer -> Frost Protection Layer ~ 750 M³, Gravel Application Layer 20 Cm Thick ~ 2.570 M² Concrete Ceiling -> Concrete Ceiling Bk 0.3 And 1, 8 ~ 5.400 M², Ac 16 Td ~ 102T Asphalt Cover Shaft, Joints ~ 1,200 M 551-Abwasser Kastenrinne N100 D400 ~ 170M, Slit Channel D400 ~ 110 M, Slit Channel A15 ~ 65 M, Shaft Adjustments ~ 92 Pieces 571 Vegetation Technology. Use Tillage To Open The Floor To Tear Up ~ 2.540 M², Deliver The Top ~ 465 M³ 573 Plants ~ 173 Pieces, Deliver Trees/Plants/Mulches ~ 173 Pieces, Plant Hole ~ 98 M³, Floor Exchange ~ 98 M³, Steel Strap ~ 250 M, 574-Grass -Ase -Sowing Soaked Up/Loosen ~ 2,310 M² -> Lawn Sowing ~ 2,310 M² 594 Break -Up Work Patch Ceiling 8 Cm ~ 420, Mosaic ~ 90 M², Asphalt ~ 215 M², Layer Without Bin
|