Tender For The Different Electrical Work Under Full Deposit Scheme 2024-25 Under 33 & Lt/11 Kv Verticalbarei ... in India
Tender Notice
TenderID
91987012
Tender Brief
Tender For The Different Electrical Work Under Full Deposit Scheme 2024-25 Under 33 & Lt/11 Kv Verticalbareilly - The Work Of Safe Carriage Of The Following Material From Cb Ganj Store Center To Work Siteunder The Jurisdiction Of Lt/11 Kv Vertical Under E
Tender For the different Electrical work under full deposit scheme 2024-25 under 33 & LT/11 KV VerticalBareilly - The work of safe carriage of the following material from CB Ganj store center to work siteunder the jurisdiction of LT/11 KV Vertical under EUDC, Bareilly . Approx. distance upto 50 Km. Including safe loading and unloading. 2 PCC Pole 8.5 meter long. 3 STP 9 Mtr Long 4 STP 11 Mtr Long 5 Line material i.e., cross arm/ conductor/ pin insulator/stay/earthing rod/Disc Fitting/Disc Insulators/11 KV XLPE Cable etc 6 11/0.4 KV 3 Phase 25 KVA T/F 7 11/0.4 KV 3 Phase 63 KVA T/F 8 11/0.4 KV 3 Phase 100 KVA T/F 9 11/0.4 KV 3 Phase 250 KVA T/F 10 11/0.4 KV 3 Phase 400 KVA T/F 11 11 KV Pilfer proof Metering cubical and CT PT Unit 12 33 KV Pilfer proof Metering cubical and CT PT Unit 13 Erection of new PCC Single/Double pole in H.T/L.T lines including fitting of all accessories as per RESSPO Norms 14 PCC Pole 8.5 Mtr Long Single Pole 15 PCC Pole 8.5 Mtr Long Double Pole 16 ST Pole 9 Mtr Long Single Pole. 17 ST Pole 9 Mtr Long Double Pole. 18 ST Pole 11 Mtr Long Single Pole. 19 ST Pole 11 Mtr Long Double Pole. 20 Grouting with 1:4:8 mixture in size(450x450x1500mm.) including cost of cement/BB & sand Required as per RESSPO Norms 21 PCC Pole 8.5 Mtr Long Single Pole 22 PCC Pole 8.5 Mtr Long Double Pole 23 ST Pole 9 Mtr Long Single Pole. 24 ST Pole 9 Mtr Long Double Pole. 25 ST Pole 11 Mtr Long Single Pole. 26 ST Pole 11 Mtr Long Double Pole. 27 The work of Driving the earthing electrode and making connections with 6 S.W.G. GI wire as per RESSPO Norms 28 Dismantling of Old and damaged conductor complete in all respect 29 Dismantling of PCC/ST Pole due to line shifting/damaged complete in all respect 30 Dismantling of Existing Distribution Transformer for increasing capacity/Shifting complete in all respect 31 11/0.4 KV 3 Phase 25 KVA T/F 32 11/0.4 KV 3 Phase 63 KVA T/F 33 11/0.4 KV 3 Phase 100 KVA T/F 34 11/0.4 KV 3 Phase 250 KVA T/F 35 11/0.4 KV 3 Phase 400 KVA T/F 36 Laying, Stringing & Sagging of Following Conductor complete in all respect 37 ACSR Weasel Conductor 38 ACSR Rabbit Conductor 39 ACSR Dog Conductor 40 3 Phase Arial Bunched Conductor 41 1 Phase Arial Bunched Conductor 42 After Mounting of CT PT unit on double pole, laying of 50 Mtr 11 KV 3cx70 sq mm cable in single circuit on river sand formDouble Pole to metering room complete in all respect. Alongwith filling of 04 nos cable jointing kits 43 After Mounting of CT PT unit on double pole, laying of 50 Mtr 33 KV 3cx120 sq mm cable in single circuit on river sand formDouble Pole to metering room complete in all respect. Alongwith filling of 04 nos cable jointing kits 44 Under ground laying of Following cable in Single circuit on river sand to Double pole situated at both sides of road complete in all respect. Minimum depth should be 0.75 Mtr and cable should be covered by bricks from three sides. Along with filling of 04 nos cable jointing kits 45 11 KV XLPE Cable Size 3x70 sqmm 46 11 KV XLPE Cable Size 3x120 sqmm 47 11 KV XLPE Cable Size 3x185 sqmm 48 33 KV XLPE Cable Size 3x120 sqmm 49 33 KV XLPE Cable Size 3x185 sqmm 50 33 KV XLPE Cable Size 3x300 sqmm 51 Under ground laying of Following cable in Single circuit by drill method to Double pole situated at both sides of NH/SH/Railway Crossing complete in all respect.Alongwith filling of 04 nos cable jointing kits 52 11 KV XLPE Cable Size 3x70 sqmm 53 11 KV XLPE Cable Size 3x120 sqmm 54 11 KV XLPE Cable Size 3x185 sqmm 55 33 KV XLPE Cable Size 3x120 sqmm 56 33 KV XLPE Cable Size 3x185 sqmm 57 33 KV XLPE Cable Size 3x300 sqmm 58 Hoisting of Following size 11 KV & 33 KV XLPE Cableon double pole with GI pipe of size 6 " dia 4 Mtr long including the jumpering complete with clamps , nut and bolts.. 59 11 KV XLPE Cable Size 3x70 sqmm 60 11 KV XLPE Cable Size 3x120 sqmm 61 11 KV XLPE Cable Size 3x185 sqmm 62 33 KV XLPE Cable Size 3x120 sqmm 63 33 KV XLPE Cable Size 3x185 sqmm 64 33 KV XLPE Cable Size 3x300 sqmm 65 Supply & Laying of 6" dia G Pipe at various places i.e road crossing & Hoisting etc. complete in all respect ((ISO certified GI pipe 150 NB 3 mm thick dia 6" would be Provided by contractor at his own cost) 66 Construction of T/F plinth 1.5x1.5x2 m3 for mounting 250/400 KVA T/F including foundation work (below ground 0.5 M), Brick work, RCC slab of 4" thickness and plastering in 1:6 ratio with 02 Nos channel pieces of 1.5 mtr long of size 100x50x6 mm compete in all respect All manpower, material and T&P provided by the contractor to complete the work. 67 Cage fencing of 250/400 KVA Plinth mounted transformer in Town areas to avoid electrical human/cattle accidents by fabrication of cage (1 Inch Sq wiremesh) made of 10 No gauge in suitable size angle iron frame of size 7.5"(L)x5"(W)x8"(H) by strengthening of wire mesh 20x3 mm M.S. flat horizontally as well as vertically, Grouting the panel with 1:2:4 cement/coorse send/brick ballast. The Frame should be bolted on angles at the four corners so that frame may be un-bolted/bolted at the time of replacement of the transformer. Provision of 1 gate should be there for maintenance of the transformer. Painting (1 coat of red oxide + 2 coat of Bus green enamel paint). The wire mesh should be earthed with 50x6 mm MS earthing strip with existing earthing of Transformer Body. All manpower, material and T&P provided by the contractor to complete the fabrication, transportation and installation. 68 The work of digging of pits, erection of Stay Clamp, Insulator etc. 69 Grouting of stays, 1:4:8 cc ratio (600x600x300mm.) as per RESPO norms. 70 Installation of 11 KV Pilfer Proof Metering Cubicle in metering room complete in all respect 71 Installation of 33 KV Pilfer Proof Metering Cubicle in metering room complete in all respect 72 Mounting of Following Capacity Transformers as per norms complete in all respect 73 25 KVA T/F 74 63 KVA T/F 75 100 KVA T/F 76 250 KVA T/F 77 400 KVA T/F 78 Fixing of Distribution Box complete in all respect 79 Guarding at road crossing complete in all respect 80 Supply & Fixing of Following Items to complete the work (If Not available in stores) 81 LT Clamps as per RESSPO Norms for PCC/ST pole 82 Nut & Bolt off size 83 F Clampas per RESSPO Norms 84 Shackle Insulatoras per RESSPO Norms 85 X-Arm Holding Clampas per RESSPO Norms 86 Stay Clampsas per RESSPO Norms 87 11 KV Composite Polymer Disc insulatoras per RESSPO Norms 88 Top Channel of size 100x50x2240 mmas per RESSPO Norms 89 T off Channelas per RESSPO Norms 90 11 KV Polymer Pin Insulator as per RESSPO norms 91 Safe back carriage of Scrap (if any) from work siteto C.B. Ganj store Bareilly approx distance upto 50 Km including safe loading & unloading. 92 Safe back carriage of Distribution Transformer from work siteto C.B. Ganj store Bareilly approx. distance upto 50 Km including safe loading & unloading. 93 11/0.4 KV 3 Phase 25 KVA T/F 94 11/0.4 KV 3 Phase 63 KVA T/F 95 11/0.4 KV 3 Phase 100 KVA T/F 96 11/0.4 KV 3 Phase 250 KVA T/F 97 11/0.4 KV 3 Phase 400 KVA T/F
Contact Information
Contact Person
SE EUDC
Address
35-B RAMPUR GARDEN BAREILLY
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 91987012
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.