Engineering Services - Drk Rescue Station Vgv Specialist Planning Tga (Elt). The Property Intended For The Construction Of The Drk Rescue Station Is Located On The Southwestern Outskirts Of Kirchheim/Teck In The Hegelesberg Industrial Area. It Is Currently Undeveloped And Reveals An Area Of Approx. 1,690.0 M² And An Access Area Of Approx. 275.0 M². The Topography Of The Property Rises In A Southern Direction By Approx. 2.0 M. The New Building Is Said To Consist Of A Vehicle Hall And Adjoining Rooms In Which Residence, Warehouse And Workshop Rooms Are Housed. 5 Large Vehicles (Each With A Parking Space Of Approx. 4.50 X 10.00 M) Are Housed In The Hall. In An Optional Second Construction Phase, The New Construction Or Cultivation Of Another Parking Space And An Outside Washing Area Is Planned. The Entire Main Area In The Room Program Is Specified At Approx. 700 M² (Including 2Nd Construction Phase). The Results Of The Building Construction Competition Are Expected To Be Made Available To The Bidders In The 2Nd Phase. The Run -In -Chief Wishes The Specialist Planners Innovative And Functional Planning Proposals For The Task Described. Design Concepts Are Expected From The Participants In The Building Construction Competition, Which, Taking Into Account Relevant Environmental Issues And Climate Protection Through An Intelligent Energy And Resource Concept, Achieve The Highest Possible Overall Economy, Usability And Architectural Quality. These Qualities Should Be Taken Into Account By The Specialist Planners And Integrated Into The Planning. In Addition, The Running Costs In Later Operation Must Be Taken Into Account In Order To Optimize The Life Cycle Costs. Subsequent Increase In The Building (Taking Into Account The Maximum Possible Building Height) Should Be Possible. In Addition, Value Is Placed On The Expected Interior Quality, In Particular On Good Room Air Quality, Which Is To Be Ensured Via A Controlled Ventilation And Ventilation System. In Addition, Window Ventilation In The Ventilation Concept Should Also Be Taken Into Account. Already In The Preliminary Planning, The Indoor Climate Must Be Further Optimized By Passive Measures (Construction, Memory Capacity Of The Components, Orientation, Coordinated Window Surface). Through Structural And Technical Measures, An Optimized Ratio Of Investment Costs To Usage Costs Is To Be Achieved. In The Design Concept, The Manufacturing, Operating And Maintenance Costs Must Be Taken Into Account By The Following Measures:- Appropriate To The Structural Measures (In Particular Area Efficiency, Building Form, Structure, Facade, Etc.); - Low Energy Costs Due To Reduced Energy Requirements And Optimized Energy Requirement Coverage; - Cleaning And Maintenance Friendliness Of The Facade; - Avoiding Maintenance -Intensive Building Technology. The Further Documents (Award -Winning Work Of The Building Construction Competition, Site Plan, Management Plans, Basic Building Reports, Archaeological Reports, Etc.) Are The Applicants In The Second Phase With De
Contact Information
Contact No.
+49 7117 6963 939
Email
eliza.rubena@kohlergrohe.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 91970166
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.