Demolition Work-Deconstruction Work Of The Equipment Maintenance Steller (Ame) And Train Maintenance Latertier (Amt) In Saint-Fargeau As Part Of The Train Maintenance Maintenance Modernization Project (Amt) In Saint-Fargeau For Mf19 Larrive. The Present Notice Aims To Set Up A Market Aimed At Basic Life-Based Work And Installation Of Site, Network Offices, Consignments, Cleaning, Asbestos Removal And Deposits Before The Reconstruction Of The Workshops Of Saint-Fargeau As Well As Maintenance Of The Base-Life And Guarding. The Work Includes In Particular: - Work To Develop Site Rights -Of -Way (Including Water Connection And Site Electrical Installations); - Maintenance And Maintenance Of Site Facilities; - Gardeing Of Site Rights -Of -Way; - The Development Of Existing Social Premises In Life Base; - Maintenance And Maintenance Of The Life Base; - The Acoustic And Vibrational Monitoring Of The Site; - Demolitions And Deposits (Including Bt/Fluid/Ssi Consignments And Cleaning Of Plumbing, Cvc, Compressed Air, Bt, Cfa, Ssi, Furniture And Equipment Left By The Operator, Etc. And Taking Into Account The Lead Risk); - The Circular Economy Process; - Asbestos Removal Work; - Auscultation Of Neighboring People; - Room Removal And Ballast; - Earthworks, Backfilling, - Vrd Work To Dedicate Networks; - Reinforced Concrete Structures Linked To The Demolition And Deviation Work Of Networks; - The Framework/Waterproofing/Coverage/Cladding Work Linked To The Demolition Work, - The Locksmith Work Prior To The Demolition Work Or Linked To The Deviation Of Networks And Social Development In Life Base; - Masonry Work Prior To Demolition Work Or Linked To The Deviation Of Local Social Networks And Development In Life Base. . The Estimated Quantities Are As Follows: - The Development Work On Site Rights -Of -Way (Including Water Connection And Site Electrical Installations): 200 Ml Fence, Ramp Daccès Rue De La Py, Etc. ; - Maintenance And Maintenance Of Site Facilities: 11 Months; - Guarding Of Site Holdings: 12 Months; - The Development Of Existing Social Premises In Life Base: 120 Heated Changing Rooms, 112M2 False Ceilings, Etc. ; - Maintenance And Maintenance Of The Base Life: 12 Months; - Site Acoustic And Vibrational Monitoring: 11 Months Including Dimpact Study; - Demolitions And Deposits (Including Consignments And Cleaning Of Plumbing Equipment, Cvc, Compressed Air, Bt, Cfa, Ssi, Furniture And Equipment Left By The Operator, Etc. And Taking Into Account The Lead Risk): 9000 M2 Slacosage, 9500 M2 Cleaning, 1,117,000 Kg Metallic Structures To Be Deposited, 7,860 M2 Coverage To Be Placed; 780 M2 Reinforced Concrete Work With Removal, 400 Ml Demolition Wall In Millstones, Etc. - The Circular Economy Approach: 1400 M2 Reused Millstone Stones, 1400 M2 Re -Used Tiles, 420 Re -Employed Furniture, Etc. ; - Asbestos Removal Work: 22 T; - Earthworks: 130M3, Backfilling: 630 M3; - Vrd Works Of Dedication Of Networks: 40 Ml Networks,
|