Architectural Design Services-D Building I 1St Floor Transformation Designing. The Design Work Covers The Complex Interior Renovation Of The 1St Floor Area Of The Dk Tract, Dk-I Tract, And The Renovation Of The Entire Staircase. In The Area Affected By The Renovation, Complex Architectural, Interior Design, Electrical And Building Engineering And Low Current Systems Will Be Renovated. The Total Net Floor Area Of Building D: 1744.96M2 Is Affected By Renovation: 132.63 M2 The Design Of The Designer By The Design Deadline: The Preparation Of The Construction Design Documentation For The Selection Of The Contractor And The Construction Design Documentation In Accordance With The 191/2009. (Ix.15.) Government Decree On The Construction Of Construction Activities - With The Technical Content, Including The Survey Of The Area Affected By The Renovation, And The Preparation Of A Survey Design Documentation That Sets An Existing State. As A Starting Point, Previous Available Plans Are Provided By The Customer, Which Are Annexed To This Design Program/Task Description. Traditional (Two-Column: Material And Charge Costs) Is Required To Make An Unexpected Budget, With A Summary, Main Summary, Editable Excel Format, 1 Xls File. The Preparation Of An Itemized Engineering Budget By Pricing Priced Budget Call Items To Determine The Estimated Value (Engineering Price). The Responsible Designer Ensures The Transfer Of 1 Copy Of The Design Documentation For The Transfer And Opinion Before The Plans Are Finalized. It Is Necessary To Repair Any Errors Indicated By The Customer And His Or Her Agent And The Removal Of The Deficiencies Within 4 Working Days After The Customer Is Notified. In The Construction Design Documentation, The Designer Is Required To Use The Term Or Equivalent With The Standard, Technical Permit, Technical Requirement, And Technical Recommendation. Until The Completion Of The Construction: The Designer Is Responsible For Participation In Any Other Conciliation In Addition To The Above, Which Requires Participation In The Process Of Competing And Construction. Answering The Technical Issues Related To The Design Documentation In The Course Of The Competition For The Selection Of The Contractor Within 3 Business Days (Technical-Professional Involvement In Additional Information). Providing Design Management During The Construction Phase, A Total Of 3 (Three) Engineering Days. Detailed Description And Tasks Are Included In The Public Procurement Documents Complementary To The Call.
Contact Information
Address
Egyetem utca 10
Contact No.
+36 306333643
Email
vig.levente@standarp.hu
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 91965204
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.