Prior Information Notice For Structural Shell Work - Shell Construction Work, Concrete Plug Columns, Scaffolding Work. The Construction Of A Fire Brigade Training Center With Administration Is Planned At The District Building Yard In Niederwerrn. Preparatory Civil Engineering, Clearing And Top Floor Discharge Run As Preparatory Measures. In The Course Of The Civil Engineering Measures, An Asphalted Construction Site Access And The Construction Fence Are Also Created. Part Of This Tender Are The Shell Construction Work With The Following Scope: Earthworks Such As Excavation Excavation, Deep Start -Ups (Concrete Plug Columns), Soil Exchange, Gravel Application Layers, Work Space Fillings And Excess Of Trench In The Course Of The Drainage Basic Lines, Water Posture, Construction Site Equipment, Concrete And Reinforced Concrete Work For A Few Work A Conventional Place Concrete Construction, Low -Foundations, Foundations , Floor Slabs, Walls, Supports, Beams, Blankets, Attica, Building Steel Exclusively Round Steel, Concrete Insert Work For Electrical Tga, Foundation Earth, External Lightning Protection, Insulation And Insulation Work, Sealing Work, Scaffolding Work, Masonry, Masonry Made Of Limestone Sandstone, Not Supporting, Integration After The Removal Work The Concrete Ceilings, Clinker Facade Made Of Blind Shell Masonry, Further Edge And Smaller Work Planum Eg Approx. 1,520 Sqm Basic Lines Kg A Total Of Approx. 330 M Of Concrete Plug Columns Dn60, Unpleasant Approx. 1,880 M Location Concrete Reinforced Individual And Striped Foundations A Total Of Approx. 305 Cbm Reinforced Concrete Floor Panels Approx. 270 Cbm Local Concrete Walls Total Approx. 430 Cbm Location Concrete Ceilings A Total Of Approx. 740 Cbm Of Concrete Steel, Round Steel A Total Of Approx. 180 Tons Of Ks Masonry, Raw Density 1.8, Thickness 24 Cm Total Approx. 110 Sqm Scale Work A Total Of Approx. 1,960 Sqm Clinker Facade A Total Of Approx. 1,360 Sqm
|