1. The Subject Of The Contract Is The Comprehensive Performance Of Construction, Assembly And Supplies Related To The Construction And Equipment Of A Local Government Nursery As Part Of A Public Task Entitled: Establishment Of 40 New Care Places Under The Toddler+ 2022-2029 - Edition 1 - In The Local Government Nursery In Goraj , 23-450 Goraj, At Ul. , - Ceiling Above The Basement + Monolithic Reinforced Concrete Elements, - Ground Floor Walls + Monolithic Reinforced Concrete Elements, - Ceiling Above The Ground Floor + Monolithic Reinforced Concrete Elements, - Attic Walls + Monolithic Reinforced Concrete Elements, - Reinforcement Of Monolithic Reinforced Concrete Elements, - Roof Structure Made Of Wooden Bars, - Roof Covering Made Of Trapezoidal Sheet, - Roof Covering With Thermosal Felt + Polystyrene, - Roof Covering With Thermoscus Felt + Mineral Wool, - Thermal Insulation Of The Ceiling Above The Ground Floor, - Partition Walls, - Carpentry And Window And Door Locksmith, - Plasters And Internal Cladding, - Floors And Floors, - Painting Robots, - Facade, - Wheelchair Shelter, - Outer Stairs To The Basement, - Main Stairs, - External Side Stairs, - Blacksmiths And Metal Elements, - Building Equipment, - Free -Standing Dustbin Shelter; 2 ) Electrical Works:- Cable Connection,- Wlz Circuits To R, R Ac/Dc, Svg And Installation Of Switchgears, W.P. And Svg Compensator,- Electrical Installation- Lighting,- Electrical- Socket Installation, Power Supply,- Computer Network And Cctv Ip Installation,- Disposing Of Disabled People,- Lightning Protection Installation,- Photovoltaic Installation,- Parking Light Cable Line,- Channel Technical,- Measuring And Rehearsal Tests Of Internal Electrical Installations; 3) Sanitary Industry Works:- Water Supply Connection,- Sanitary Sewage Connection,- Installation Of Cold, Warm Water, Circulation;- Hydrant Installation,- Central Heating Installation,- Heat Pump Technology,- Air Conditioning; 4) Construction Of An Internal Road, Parking Lot And Pavements:- Earthworks- Prefabricated Reinforced Concrete Resistance Wall- Internal Road And Parking From Paving Stones- Pavements, Band, Terraces Of Paving Stones- Stabilization Of The Slopes Along The Road- Lawns- External Panel Fence3. The Range Of Equipment Supply In Accordance With The Technological Design Includes:- Gastronomic Equipment,- Functional Equipment,- Multimedia Equipment,- Computer Equipment,- Hygiene And Sanitary Equipment. 4. Basic Parameters Of The Building:- Building Area- 373.48 M2- Usable Area- 330.39 M2- Internal Area- 344.24 M2- Volume- 1 859.58 M3- Building Width- 9.74 M- Building Length- 44 , 60 M- Building Height- 5.98 M- Number Of Floors- 2 (Above-Ground: 1, Underground: 1) 5. A Detailed Scope Of Work (Description Of The Subject Of The Contract) Is Included In Annex 1 To Swz - Design Documentation, Which Includes: 1) Architectural And Construction Project, 2) Land Development Project, 3) Technical Design Of The Construction Industry, 4) Technical
|