1. Subject Of The Contract. Parkowa In Ełk. The Scope Of The Study Is Closed On Plots No. 3775/7, 3775/8, 3775/10, Precinct 0003 Ełk 3, Commune Of The City Of Ełk. The Area In Question Is Covered By Resolution No. Xi/87/99 Of The Ełk City Council Of July 7, 1999 Regarding The Local Spatial Development Plan Of The Limited Area Ul. Kiliński, The Ełk River, The Area Of The Congregation Of The Benedictine Sisters Of The Missionaries And Lake Ełcki Called Ełk Cypel. 1.1. The Scope Of The Order A) The Scope Of The Order Includes The Implementation Of Complete Project Documentation Divided Into 13 Stages, Including:- Camping And Camping Zone;- Indoor Sports Zone;- Concert Zone With Catering Facilities;- Play Zone For The Youngest;- Relaxation Zone On Hammocks; - Beach Sports Zone;- Dressing Room And Beach Showers;- Beach And Bathing Zone;- Feast Zone With Hearths;- Sauna Zone;- Water Equipment Rental Zone;- Water Sports Zone;- On Foot- Bicycle- B) For Tasks The Contractor Includes, Among Others:- Obtaining A Current Map For Design Purposes For The Needs Of The Development Of The Area Of Land,- Implementation Of Geological And Engineering Documentation,- Obtaining Technical Conditions From Media Gestors And Making Projects For Reconstruction Or Construction Of New Networks And Connections Necessary For The Proper Functioning Of The Facility Covered By The Project,- Construction Of A Construction Project Together With All Arrangements And Studies Necessary For The Implementation Of The Task, Including: Land Development Project, Architectural And Construction Design,- Implementation Of Technical Projects For All Industries (As Projects Detailing Works, Investor Cost Estimates Along With A Collective List Of Costs Divided Into Individual Stages And Detailed Technical Specifications Of Construction And Unit Of Construction Works,-Construction Design Should Be Transferred In 5 Paper Copies, Technical Projects In 4 Eg-Marks While Other Studies In 2 Copies. In Addition, The Contractor Will Provide All Documentation In The Electronic Version (In The Editable Version And Pdf Version) On The External Medium,- Projects Before Submitting An Application For A Building Permit Should Be Agreed With The Contracting Authority And Obtaining A Positive Opinion Of The Team Of Opinions On Investment Projects (Zopi),- Obtain Permission For Construction Based On Developed Projects,- Obtain Possible Consent To The Felling Of Trees And Shrubs In The Event Of A Collision Of Trees And Shrubs With A Proposed Investment. 1.2. Due To The Fact That The Documentation Will Be Used In The Public Procurement Procedure For Construction Works, The Contractor Is Obliged To Perform This Documentation In Accordance With The Requirements Referred To In Art. 99 - 103 Of The Act Of 11 In 2019, Public Procurement Law (Journal Of Laws Of 2024, Item 1320), Under Pain Of Incurring Financial Consequences (In Full Amounts) For Possible Financial Corrections Imposed On The Contracting Authority By C
Contact Information
Address
Gmina Miasto Ełk,Ełk,19-300,Warmińsko-Mazurskie,Pl623 - Ełcki
Contact No.
0877326200
Email
um@um.elk.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 91960691
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.