3 The Sewage Network Will Be Made In A Gravitational And Pressure System In The Town Of Ruda With A Length Of About 2.7 Km (Gravitational Network) And 0.5Km (Press Network). The Collector Routes Have Been Adapted To The Existing Building And Development Of The Area And The Existing Technical Infrastructure. Raw Sewage Reaching The Sewage System Will Be Transported To The Designed Sewage Treatment Plant (According To A Separate Study), Located On Plot No. 809. The Border Point Of Both Studies Is The Sewage Well Designated In 13. Realization Of Sanitary Sewage System Will Significantly Improve The Living Conditions Of The Inhabitants Of Ruda And Will Have A Positive Effect On Environmental Values, Because Currently Sewage Is Discharged To The Home-Made Drainage Tanks For Liquid Waste, Which Causes An Uncontrolled Discharge Of Sewage From These Tanks To The Environment. The Study Includes The Project Development Project For The Construction Of A Sanitary Sewage System, Which Will Discharge The Domestic And Economic Sewage From Buildings Located In The Town Of Ruda - Paths Ii. A Gravity Sewage System And Pre -Draft Sewage Sections Were Designed With The Course Of Routes Adapted To The Current And Expected Development, After Obtaining The Consent Of The Property Owners To The Course Of Sewage Cables, Taking Into Account Existing Roads And Existing Utilities. The Designed Sewage System In Ruda - Path Ii Will Allow Sewage To Be Discharged From Unconventional Buildings To The Designed Sewage Treatment Plant. Parameters Of The Designed Construction Intention Sanitary Sewage) Main Sewage Networks Pvc Ø250 Ø250 With A Length Of About 1.4 Km) Main Sewage Networks Pvc Ø200 With A Length Of About 0.8 Kmb) Pe 225 Main Sewage Networks With A Length Of About 0.07 Kmc) Main Sewage Networks Pe 280 With A Length Of About 0.31Kmd) Pvc Distribution Sewage Networks Ø160 With A Length Of About 0.04 Kmobsia Located Below The Main Gravity Collectors Will Be Included In The Network For The Network Help The Sewage Pumping Plant Through The Sections Of The Pe -Pipeline Pe Ø90x5.4Mm With A Total Length Of 0.52 Km. Electrical Brilliacs The Subject Of The Study Is The Receiving Electrical Installation For The Topic: Construction Of A Sanitary Sewage System With Sewage Pumping Stations And Sewage Treatment Plants In Ruda - Paths Ii, Gm .Radomyśl Wielki”. P2 And P3.2 And P3.2. The Detailed Scope Of The Subject Of The Contract Is Determined In The Bill Of Quantities, Offer Cost Estimates, Technical Documentation And Detailed Technical Specifications That Attach To The Specification Of The Terms Of The Contract.
Contact Information
Address
Gmina Radomyśl Wielki,Radomyśl Wielki,39-310,Podkarpackie,Pl824 - Tarnobrzeski
Email
sekretariat@radomyslwielki.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 91960675
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.