Construction Work - Detain Work, Repair And Redevelopment Of Building - Loire Valve - Val De Loire. 00 (Utc+2),False Floor Installation Work France,Loiret(Frb06) Duration36Months Deadline For Receipt Of Tenders04/02/2025-120000 (Utc+2),Painting Work France,Loiret(Frb06) Duration36Months Estimated Value Excluding Vat850 000,00Eur Deadline For Receipt Of Tenders04/02/2025-120000 (Utc+2),Construction Work France,Loiret(Frb06) Duration36Months Estimated Value Excluding Vat425 000,00Eur Deadline For Receipt Of Tenders04/02/2025-120000 (Utc+2),Heating, Ventilation And Air-Conditioning Installation Work France,Loiret(Frb06) Duration36Months Estimated Value Excluding Vat3 400 000,00Eur Deadline For Receipt Of Tenders04/02/2025-120000 (Utc+2),Masonry Work France,Loiret(Frb06) Duration36Months Estimated Value Excluding Vat1 100 000,00Eur Deadline For Receipt Of Tenders04/02/2025-120000 (Utc+2),Installation Work Of Blinds France,Loiret(Frb06) Duration36Months Estimated Value Excluding Vat50 000,00Eur Deadline For Receipt Of Tenders04/02/2025-120000 (Utc+2),Construction Work France,Loiret(Frb06) Duration36Months Estimated Value Excluding Vat1 500 000,00Eur Deadline For Receipt Of Tenders04/02/2025-120000 (Utc+2),Masonry Work France,Loiret(Frb06) Duration36Months Estimated Value Excluding Vat1 300 000,00Eur Deadline For Receipt Of Tenders04/02/2025-120000 (Utc+2),Lot 04 Outdoor Carpentry (Aluminum And Pvc - Glazing - Miroiterie),Lot 06 False Ceiling - Modular Partitions - Technical Floor,Lot 05 Painting - Wall Covering - Flexible Floor Covering - Resin,Lot 11 Cover,Lot 08 Plumbing - Heating - Ventilation - Air Conditioning,Lot 01 Masonry - Plastering - Tiles,Lot 13 Stores - Roller Shutters - Occultations - Adhesive Films,Lot 07 Strong Current Electricity - Low Current,Lot 02 Metalwork - Locksmith
|