1. The Subject Of The Order Is The Renovation Of Walls And Ceilings And Floors In Classrooms And In The Corridor On The Second Floor In The 1St High School In Jaworzno At Ul. High School 3. Conclusion Of Works In The Field Of: Door Joinery - Replacement Of A Steel Door Joinery With A Frame And Installation Of Plate Doors, Forging From The Wall Of Wooden Frames, Forging Unevenness, Assembly Of Steel Frames, Filling And Smoothing Unevenness, Emulsion Paint And Lamps With Oil Paint, Assembly Steel Frames And Interior Door Wings, Installation Of Thresholds. Painting Walls And Ceilings: Forging And Setting Ventilation Grilles, Protecting Floors And Windows, Scraping And Washing Of Old Paint, Abrasion Of Internal Plasters, Supplementing Defects, Repair Of Cracks And Damage, Filling Of The Scorch , Deleting Efflorescence, Soil Grounding, Making A Strap Of Plain Plaster With A Width Of 15Cm After The Demolition Of Plinths, Painting The Walls Above The Lamella And Ceilings With Emulsion Paints, On The Walls Below Painting Emulsion Painting With Oil Paint. Breaking Of Wooden Plinths, Putting Down The Gaps In The Dance Floor, Milling The Surface Of The Concrete Floor After Removing The Parquet, Alignment Of Defects And Repair Of Cracks In The Floor, Cleaning The Substrate, Concrete Screed, Priming, Making The Compensatory Layer From Cement Brick And Equalizing Polymer -Cement Undercoat, Grounding Horizontal From Liquid Foil, Smelling Of Unevenness And Making Plaster Belts After Breaking The Wall Slats, Arrangement And Welding Of Floor Coverings. Parquet Staves: Local Replacement Of Parquet Staves, Demolition Of Wooden Plinths, Mechanical Scraping Of Floors Made Of Parquet Staves, Spatulas Of The Fractures In The Floor, Replacement, Replacement. Wallside And Painting, Painting Floor With Parquet Stave, Making Slats By The Stairs, Removal And Utilization Of Waste Resulting During Work. Construction Works: Demolition Of Masonry Partition Walls, Demolition Of The Fireplace Dummy In Scouts, Dismantling Of Ceiling Curtain Rods As Well Under The Partition Walls, Making Partition Walls Made Of Drywall On A Steel Grate With Acoustic Filling, Priming And Plastering, Painting. Pursuant To: 1. Technical Perspective And Acceptance Of Construction Works Regarding Renovation Of Walls And Ceilings As Well As Floors In Classrooms And In The Corridor On Ii. Floor At The 1St High School In Jaworzno At Ul. High School 3. Constituting Annex 1 To Swz, 2. The Pre -City Of The Renovation Of Walls And Ceilings And Floors In Classrooms And In The Corridor On Ii. Floor At The 1St High School In Jaworzno At Ul. High School 3.
|