A) The Subject Of The Public Contract Is A Construction Work Consisting In The Construction Of The Parking Lot At Ul. Kniaźnina 29, Together With The Execution Of Dehydration, Lighting And Internal Armament Spacers, B) The Contracting Authority Described The Subject Of The Contract On The Basis Of: - Planned Provisions Of The Contract (Ppu), Constituting Annex 2 To Swz, - Project Documentation, Constituting Annex No. 8 To Swz, - Sst , Constituting Annex 9 To The Swz- Malicine Of Works, Constituting Annex 10 To Swz.C) In The Event Of An Attachment To The Swz Manufacturers Names, Trademarks, Standards, Approval, Technical Specifications And Reference Systems, Products Can Be Replaced By Equivalent. The Employer Will Consider Such Solutions As Equivalent Solutions That Allow You To Obtain The Effect Of The Employer Using Other Technical Solutions. An Identical (Identical) Solution Cannot Be Considered As Equivalent Solutions, And Only Those That Indicate Exactly The Same Or Very Similar Usable Value In The Compared Features. By Indicating The Names Of The Manufacturer, Trademarks, Standards, Approval Or Reference Systems, The Contracting Authority Was Aimed At Determining The Minimum Quality Parameters And Utility Features, Which The Goods Must Be Met To Meet The Requirements Set By The Ordering Party And Constitute Only A Qualitative Model Of The Subject Of The Contract. By A Provision Regarding The Minimum Requirements Of Quality Parameters, The Contracting Authority Understands The Requirements Of Goods Contained In Generally Available Sources, Catalogs, Manufacturers Websites, And The Like. Operating Sample Names Of The Manufacturer Is Only Intended To Clarify The Level Of Expectations Of The Employer In Relation To A Specific Solution, D) The Minimum Warranty Period Is 36 Months. The Maximum Warranty Period Is 60 Months. Offers Containing The Warranty Period Shorter Than 36 Months Will Be Rejected. Failure To Comply With A Given Condition Will Result In The Contracting Authority, Respectively Or Objection. 95 Para. 1 Of The Public Procurement Law, Requires Employment By The Contractor Or Subcontractor On The Basis Of An Employment Relationship, Persons Performing Below, Except For Persons Performing The So -Called Independent Technical Functions In Construction Within The Meaning Of The Construction Law:- Lower-Level Employees (Organization And Implementation Of Construction Works),- Physical Workers (Direct Performance Of Construction Works). Note Commercial Law.G) The Ordering Party Before Signing The Contract And During Its Implementation Has A Legitimate Control Of The Fulfillment By The Contractor Or Subcontractor Of The Requirements Indicated In Part 1 Point 3 Of Swz, In Accordance With The Provisions Of The Planned Provisions Of The Contract. H) The Contract Implementation Deadline: 4 Months From The Date Of Transfer Of The Area Construction. I) Information On The Contractor To Conduct A Local Vision Or Checking The Documents Necessary T
Contact Information
Address
Zarząd Dróg Miasta Krakowa,Kraków,31-586,Małopolskie,Pl213 - Miasto Kraków
Contact No.
126167416
Email
sekretariat@zdmk.krakow.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 91901630
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.