Site Preparation Work - Construction Of Sanitary Sewage System In The Towns: Gowarzewo, Tulce, Szewce And Komorniki, Commune As Part Of The Project, Kleszczewo.. Construction Of Sanitary Sewage System In The Following Cities: Gowarzewo, Tulce, Szewce And Komorniki, Commune Kleszczewo ”As Part Of The Project, Comprehensive Development Of Water And Sewage Management In The Kleszczewo Commune, The Scope Of Works Covered By Swz: 1. Performance Of Construction And Assembly Works According To The Design Documentation For The Scope Specified In Point 1.0., 2. Subject Of The Order For The Sanitary, Electric And Road Industry, 3. Measurement And Geodetic Works, 4. Delivery And Assembly Of New Materials And Devices, Before Building, The Contractor Will Be Required To Obtain The Acceptance Of The Material Application By The Ordering Party And The Supervision Inspector. 5. Execution Of A Temporary Traffic Organization For Construction Time With All Arrangements, 6. Execution Of Full Weapons Of The Networks Covered In Accordance With The Design Documentation, 7. Organization Of The Construction Facilities With The Square For Storage Of Materials And Temporary Toilet, 8. Earthworks And Earth Utilization From The Excavation, 9. Making The Labeling Of The Built -In Fittings (Plates On The Posts), 10. Development Of The Area After Excavations: Ordering, Sighting, Sowing Grass, 11. Recreation Of Damaged Surfaces, Restoration Of The Surface To The Original State, 12. Sanitary, 13. Performing Tightness Tests On The Gravitational Sanitary Sewage Pipeline, 14. Performing Research On The Density Of Land After Completed Excavations, 15. Ceremoning Of All Gravitational Channels, 16 Weapons. In The Event Of A Collision With Existing Drainage, You Should Report And Agree The Method Of Repair With The Commune Water Company In Kleszczewo. Document The Place Of Removal Of The Collision And The Method Of Repair. 18. Dehydration Of Excavations During Works Along With Water Drainage From Excavations. 19. Marking And Securing The Construction Site, The Construction Manager Will Be Obliged To Draw Up The Bioz Plan. 20. Ensuring Appropriate Material, Equipment And Qualified Service For The Implementation Of The Task. 21. Utilization Of Waste, Maintaining Order At The Construction Site. 22. Lightning Of Work Monitoring And Control Of All Pumping Stations, Tissue Wells And Local Pressing Points To The Existing Monitoring And Notification System At Sms At The Municipal Plant In Kleszczewo Sp. Z O.O. 23. Implementation Of As -Built Documentation: 2 Copies In Paper Form, 2 Copies. Electronic Version On A Cd Or Other Electronic Medium, 24. Execution Of As -Built Geodetic Inventory. 25. Providing Residents To Reach The Property While Performing Work. 26. Submission Of An Application To Pinb And Obtaining A Certificate Of Completion Of Construction.
|