Engineering Services - Vgv Specialist Planning Tga (Hls) - New Fire Brigade Neustetten. The Competition Property With A Size Of Approx. 3,645 M² Is Located On The Western Edge Of Remmingsheim Within The New Industrial Area In Hauser Feld And Comprises Two Properties, Both Owned By The Municipality Of Neustetten. The Competition Is Currently Undeveloped. The Average Height Is 455 M Above Sea Level. Nn. According To The Development Plan, 2 Full Floors Are Permitted In The Max. 2 Industrial Area. The Room Program Provides For A Vehicle Hall With At Least 4.5M Light Height For A Total Of 4 Parking Spaces With A Length Of 12.5M (Width 2X4.5M, 5M And 7M), As Well As A Wash Hall (Parking Space 6.50M X 12.50M), Workshop Area, And An Alarm, Training And Social Area For The Fire Brigade. The Construction Of The Exercise Tower Is Optional And May Only Be Implemented In A 2Nd Building. The Building Should Be Built In A Solid Construction Or, If Economically Sensible, In Hybrid Construction. Overall, The Nuf Is Approx. 1170M², Including Approx. 344M² For The Vehicle Hall And Washing Hall. The New Roof Areas Can Be Considered To Restraint Rainwater In The Form Of Green Roofs. This Potential Should Be Closely Related To Possible Photovola-Caric Systems And Should Be Shown Accordingly. Suggestions For The Energy Requirement Of The New Building Through Renewable Energies Are Desired. The Following Points Should Be Observed: - Structures On The Roof Such As Fans, System Technology, Fireplaces, Etc. As If Possible In The Northern Area Or In The Outer Area In Order To Keep The Shaded Area On The Roof As Low As Possible - When Planning The Roof Area Provide A Maximum Possible Space For Pv Modules. Keep Interruptions Of The Free Roof Area As Low As Possible Or Concentrate On A Few Places-Static Loads From The Pv System, Provide For Approx. 20 Kg Per Square Meter Pv System Area. The Run -Up Names A Target For The Total Cost Of Approx. Eur 6.6 Million Gross In The Cost Groups 200 To 700. Funding Has Already Been Applied For. The Examination Of The Principles Of Sustainable Construction According To § 9 Paragraph 2 Climate Protection And Climate Change Adjustment Act Baden-Württemberg (Klimagbw) For Building Construction Measures Must Be Demonstrated. The Start Of Planning Kw 27/2025, Construction Preparation Intended For Autumn 2027. Addition Tga: The Aim Is That The Highest Possible Proportion Of Renewable Energies Can Be Provided For The Need Coverage. The Building Energy Sources Act (Ag) Represents The Minimum Requirements For The Most Co²-Neutral Energy Supply. There Is No Connection To A District Heating Network. The Management Plans Are Made Available In The 2Nd Phase Of The Procedure. The Disposal Of Dirt And Surface Water Takes Place In A Separation System. Wastewater Disposal Can Take Place Via The Existing Sewer Network In The East. Since A Washing Area Is Also Intended For Cleaning The Vehicles, The Construction Of A Light
Contact Information
Address
Hohenzollernstraße 4
Contact No.
+49 747293650
Email
gemeinde@neustetten.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 91885974
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.