Lot 1 - Civil Junior Work Engineer With Complementary Charges, Lot 1 - General In Charge With Complementary Charges, Lot 1 - River Transportation Of Ferry Materials With Capacity Of 1000, Lot 1 - Manual Ditch Manual. Af_09/2024, Lot 1 - Background Preparation With Width Less Than 1, 5 M (Hit, 01/29/2025, Lot 1 - Manual Ditches, With Soil Compactor, Lot 1 - Concrete Ballast Skinny, Applied To Crown Blocks Or, Lot 1 - Manufacture, Mounting And Disassembly Of Shoe Form, In, Assembly And Disassembly Of Beam, Lot 1 - Block Frame Using 5 Mm Ca -60 Steel - Assembly. Lot 1 - Block Frame Using 10 Mm Ca -50 Steel - Assembly., Lot 1 - Block Frame, Isolated Shoe, Baldrame Beam And Shoe Running, Lot 1 - Concrete Fck = 25Pa, Draw 1: 2, 3: 2 , 7 (In Dry Mass/, Lot 1 - Launch Using Buckets, Thickening And Finishing Of, Lot 1 - Fall Manufacture For Pillars And Similar Structures, Lot 1 - Folding Manufacture For Beams, With Sawn Wood, And = 25 Mm, Lot 1 - Pillar Frame Or Conventional Concrete Structure Beam, Lot 1 - Pillar Frame Or Conventional Structure Of Com, 7 (In Dry Mass C, Densification And Fin, Lot 1 - Square Pillar Not Loved * 20 X 20 * Cm, In Macaranduba, Angelim Or Equivalent Of The Region - Gross. Supply And Installation, Lot 1 - Non -Located Beam * 6 X 12 * Cm, Lot 1 - Cement Mortar Surface Waterabilization E, Lot 1 - Surface Waterproofing With Membrane Based, Lot 1 - Ceramic Floor Cleaning Or Porcelain Tile Using Detergent, Lot 1 - Wood Floor Removal (Floor And Barrot) Manually Without Reuse. Af_09/2023, Lot 1 - Demolition Of Ceramic Coating, Without, Applied On Floors, Slabs On Soil, Lot 1 - Contrap; Unlocked Finishing, 5Cm Thickness. Af_07/2021, Lot 1 - Ceramic Floor Coating With Enamelled Plates Of, Lot 1 - Performing (Sidewalk) Or Concrete Floor With Concrete, Lot 1 - Wood Floor. Af_09/2020, Lot 1 - Granite Threshold, 15 Cm Width, Thickness 2, 0 Cm. Af_09/2020, Lot 1 - Floor In Granilite, Marble Or Granin In Indoor Environments ,, Lot 1 - Emerald Grass Planting Or São Carlos Or Curitibana, Lot 1 - Removal Of Wooden Plot, Lot 1 - Removal Of Scissors From Scissors Wood, With Going Less Than 8M, Shaped, With 8M Or Equal To Or Equal To, Lot 1 - Wooden Plot Composed Of Slats, Rafters And Tuesdays To, Lot 1 - Fabrication And Installation Of Non -Wooden Scissors, Lot 1 - Manufacture And Installation Of An Entire Scissors And Lot 1 - Manufacture And Installation Of Treasure, Lot 1 - Inteir Scissors Manufacture And Installation, Lot 1 - Metallic Plot Removal For Cover, Lot 1 - Metal Scissors Removal, Lot 1 - Steel Plot Composed Of Tuesdays For Roofs Up To 2 Waters, Lot 1 - Installation Of Metallic Windling, Lot 1 - Manufacture And Installation Of Entire Scissors In Steel, Ranging From 10 M, Ranging From 8 M, Ranging From 6 M, Lot 1 - Removal Of Metal And Ceramic Fiber Cement Tiles, Lot 1 - Steel/Aluminum Tile Roof E = 0, 5 Mm, Up To 2 Waters, Lot 1 - Removal Ramps, Without Reuse, Lot 1 - Galvanized Steel Rail Number 24, Development Of, Lot 1 - External/Internal Ruff
|