The Subject Of The Contract Is The Performance Of: Installation Of The Crane And Disassembly Of The Existing Device At The Forestry Technical School In Tuchola Adama Loreta ”Investment Address: Plot No. Revis. Adam Loretaul. Nowodworskiego 9 89-500 Tuchola. 3.2. General Scope Of Works: A Detailed Scope Of Works Was Specified In The Construction Project, Technical Documentation Specifying The Subject Of The Contract And A Pre -City Of Works (Auxiliary Document Used To Prepare The Offer) - Constituting In Annex 1 To Swz. 3.3. General Scope Of Construction Works- Disassembly Of An Existing Crane,- Assembly Of A New Crane. Hydraulic Case That Meets The Requirements Of The Eu Directive And National Regulations Regarding Close Transport Devices Along With Obtaining The Necessary Consents And Arrangements And Decisions Permitting Operation- Hydraulic Passenger Crane- Lifting- 900Kg- 900Kg- Number Of Stops: 5- Number: 5- Crane Speed: Up To 0.63 M/S- Lifting Speed: 13980Mm- Pad: 1500Mm- Tips: 3630Mm- Cabin Doors: Automatic, Left, 900X2000mm, With Stainless Steel, Equipped With Curtain Light- Shaft Doors: Automatic, Left, 900X2000mm, Stainless Steel- Crane Cabin: Stainless Steel Walls, Non-Slip, Non-Flammable, Difficult, Powerless, Incompatible, Disposable Panel, Emergency Lighting, Electronic Screen And Direction Shot, Braille, Voice Information System, Alarm Button, Cabin Overload Signaling, Basic Energy-Saving Lighting, Gong, Handrails, Mirror, Fan- Call Cassettes: With Bodies, Illuminated Buttons, Signaling The Direction Of Further Driving,- Control: Microprocessor: Microprocessor- Emergency Exit Drive: Hydraulic- Oil Cooler- Machinery: Lower, Side- Communication System With Rescue Services: Through The Gsm Device (Sim User Card) All Materials Used For The Implementation Of Works Should Correspond To The Quality Of The Requirements Of Products Allowed For Trading And Use In Construction- Detailed Information Annex No. 1 - Technical Documentation - Construction Project. 3.4. The Contractor Is Required To Read Full Technical Documentation, Which Is Part Of This Specification. The Employer Recommends Making A Vision Of A Local Construction Site In Order To Read The Conditions Of Works And Obtain Any Information That May Be Necessary To Prepare The Offer And Proper Performance Of The Contract, In Particular In Terms Of Checking The Completeness And Correctness Of The Tender Documentation. The Costs Associated With Conducting A Local Vision Are Borne By Every Contractor. The Contracting Authority Will Enable The Contractor To Enter The Planned Investment, Within The Agreed Period. 3.5. The Contracting Authority Requires That The Renovation Team Be Characterized By A High Personal Culture Due To Conducting Work In The School Building. In Addition, It Is Forbidden To Smoke Cigarettes At The Construction Site And The Incorrect Use Of Devices Or Machines Necessary To Perform Works, Which Would Threaten A Possible Fire. 3.6. When Performing Works, The Place Of W
|