1. The Purpose Of The Order Is To Design Aesthetic, Well Inscribed In The Landscape And Safe For Users Of The Bridge Crossing Along With Access, Located Along Poviat Road No. 2189K In A Mileage Of 10+526 In The Town Of Czułów (Baczyn) Through The Sanka River. The Existing Bridge Is In Poor Technical Condition, Has Limited Load Capacity And Due To The Fatigue Of The Material Of The Basic Elements Of The Bridge It Is Not Possible To Renovate It. The Bridge Requires Reconstruction. There Are No Pavements On The Facility. 2. The Purpose Of The Order Is Also To Improve Traffic Safety As Well As Communication Availability. 3. The Purpose Of This Study Is Also To Identify Possible Implementation Problems And Negative Interactions. As Part Of The Study, It Is Necessary To Recognize And Present Environmental, Organizational, Technical, Economic, Economic, Economic, Economic, Economic, Economic And Spatial Investment. , Conducting Traffic By Other Roads Or Possibly A Traveling Bridge, Reconstruction Of Colliding Foreign Devices Together With The Financial Analysis Of These Solutions In Order To Achieve The Best Result For The Task In Question With Social And Economic Justification. 4. Scope Of The Study: A) Making A Multi-Variant Bridge Concept With Bilateral Pavements, B) Development Of Project Documentation For The Selected Variant:- Demolition Project Of The Existing Bridge,- Construction Project,- Executive Project,- Project Of The Target Traffic Organization,- Project Of The Temporary Traffic Organization) Obtaining All Necessary Conditions, Reviews, Arrangements And Enforceable Administrative Decisions Required By Law Enabling The Implementation Of Designed Construction Works (Including The Decision On Environmental Conditions, Water Permit, Building Permit Or Permission To Implement A Road Investment (Zrid)). . As Part Of The Study, It Should Be:- Obtain A Map For Design Purposes (Situational And Severity On A Scale Of 1: 500),- Acquire From Networks Of Networks The Terms Of Translating Them Outside The Object. For An Environmental Decision (Including The Project Information Card (Kip)) Containing The Most Important Data About The Planned Project) Together With The Submission Of A Request To Obtain A Decision On Environmental Conditions Together With The Justification For The Assignment Of Immediate Enforceability (If Necessary, Develop A Report On The Impact Of The Project On Environment),- Develop A Cost Estimate, Bill Of Quantities, Technical Specifications. 6. Technical Parameters Of The Designed Access To The Bridge:- Technical Class Of Access Roads With,- Design Speed 50 Km/H,- Two-Lane Roadway, Lanes With A Width Adapted To The Existing Roadway From The Beginning With A Width Of 2X3.0M + 2X0.5M Band,- Permissible Surface Loads- 115 Kn/Axle,- Traffic Category Kr3,- The Designed Communication Solution Must Keep Individual Conventions To Adjacent Properties From The Poviat Road. If The Planned Investment Conflicts With Existing Foreign Devices (
|