Architectural, Construction, Engineering And Inspection Services - Implementation Of Project Documentation For The Project: Revitalization And Thermomodernization Of The Building At Ul. 1 Maja 97 In Wałbrzych Together With The Development Of The Adjacent Area. 3 Building At Ul. 1 Maja 97 In Wałbrzych Together With The Development Of The Adjacent Area - Plot No. 452/1 And 451/1 Rev. No. 30 Sobięcin. As Part Of The Subject Of The Contract, The Implementation Of Complete Project And Scoop Documentation Based On The Current Provisions And Guidelines Of The Ordering Party On The Basis Of The Technical Opinion Of The Building And On The Basis Of The Guidelines Of The Conservator Of Monuments-A Building At Ul. 1 Maja 97 In Wałbrzych Is Located In The Monument Register And Is Located In The Historic Urban Layout Of The Sobięcin District - Entered In The Register Of Monuments By Decision Of 31.05.1978 Under The Number A/715/696/Wł. The Study Should Include, Among Others: A) Changing The Function Of The Building To A Residential Building With Two Or Three Staircases, B) Preserving At Least Two Of The Existing Facades Including The Front And Side Facade From Ul. Saint. Józef (Taking Into Account The Provisions Of The Draft Resolution On The Local Spatial Development Plan Of The Area Located In The Area Of May 1, St. Józef, Emilia Plater In Wałbrzych), C) Conducting Comprehensive Land Research Due To The Occurring Mining Damage, D) The Design Of The Premises Residentials With A Structure Of 2-3 Rooms (A Room With A Kitchenette Is Allowed), E) A Design Of Apartments On The Ground Floor For People With Disabilities, Moving In Wheelchairs, F) Facilities For People With Disabilities, Including Invalidants And Visually Impaired, G) Taking Into Account Pro -Ecological Solutions, E.G. Decarbonization Of Real Estate, An Intelligent Management System For All Electricity And Heat Emerging And Consumed In A Building, Recuperation, Solutions That Reduce Water Consumption And Use Of Rainwater, H) Heating Apartments From A Local Heat Source Powered By Renewable Energy - Pv Installation Cooperating With Heat Pumps (Possibility Of Remote Control And Control Of Pv And Boiler Room), I) Performing The Necessary Moisture And Thermal Insulation Of The Building, J) Performing All Necessary Installations, Including Central Heating, Water And Sewage, Electrical With The Possibility Of Connecting An Electric Stove With Oven, With Separate Metering For Individual Users, K) Teletechnical Installations: Intercom, Internet, Electronics/Satellite, Monitoring, L) Finishing Of Residential Premises In The Field Of: Floor Panels And Floors Made Of Stoneware Tiles, Wall Covering Made Of Ceramic Tiles, Kitchen Equipment With Single -Chamber Sinks With A Drainage Mounted On The Cabinet, Bathroom Equipment With Cannons
|