Engineering -Related Scientific And Technical Services - “Vd Cryry - Monitoring Of Boreholes Pre -Project Preparation”. 1. As Part Of Pre -Project Preparation Of Vd Cryry, Boreholes, Geodetic Points And Wells Were Monitored And Monitored. Until The Next Level Of The Project Documentation, The Monitoring Of The Above Mentioned Range Must Be Ensured. 2. The Contractor Undertakes To Ensure: Inclinometric Boreholes Within Ig And Hg Survey Were Made 3 Inclinometric Boreholes (Ink101, Ink102, Ink103). In The Above -Mentioned Boreholes, Measurements Will Be Carried Out By An Inclinometric Probe With A Frequency Of Once Every Two Months. Geodetic Profiles Are Located 20 Geodetic Points In 5 Different Profiles. The Measurement Will Be Performed With A Frequency Once Every Two Months. Home And Agricultural Wells For Monitoring Were Selected All The Well -Found Wells That Are In The Area Of Vd Kryry And In The Vicinity. In The Wells Below, The Groundwater Level Will Be Measured Manually By An Electric Level With A Frequency Of 1X Every 2 Months + Monitoring And Water Quality Collection 2 Wells S17 And S14 (Černčice), Which Have Not Yet Been Monitored. The Recommendation Is To Perform Water Collection For Chemical Analysis In The Area Under The Dam And In The Černčice Area (Hg112, S6, S11, S12 + S14 And S17) With A Frequency Twice A Year. S2 And S3 Are Not The Subject Of Further Monitoring. See The Tender Documentation In More Detail. Hydrogeological Boreholes For Monitoring Groundwater Levels Were Chosen By 20 Equipped Hydrogeological Wells Carried Out Within Ig And Hg Survey (17 Wells) And 3 Haunted Hydrogeological Wells (See Table 1). In The Above -Mentioned Boreholes, Manual Measurement Of Groundwater Levels With A Frequency Of Once Every Two Months Will Be Carried Out. See The Tender Documentation In More Detail. Newly Built Measuring Pillars: In This Stage Of Reconnaissance And Monitoring Works, Measuring Pillars Will Be Newly Built In 6 Points. Each Of The Following Points Will Have A Firm Reflective Goal. The Measurement Methods Used (Intersecting, Polar Method) Remain Unchanged. With Fixed Meter Pillars, We Will Achieve Less Uncertainty Of Random And Systematic Errors. These Points Will Be Designed To Be Used To Measure The Future Waterworks Of The Cryry. At The Same Time, The Requirement For The Above Is To Create A Monitoring Project That Will Be Submitted For Approval And Then The Relevant Permit For The Establishment Of Reference/Pillars Will Then Be Settled. 3. Furthermore, The Subject Of The Work Is Considered: A) Documenting The Status (Photo Documentation) Of The Workplace Before The Start Of The Work, For The Later Comparison Of The State After The Completion Of The Work (For Newly Established Points) B) The Disposal Of All Waste Increasing In The Legal Manner, Securing Landfills And Deponies, Incl. . Keeping Records On The Resulting Waste And Handover Of Documents On Their Disposal To The Client When Handing Over And Taking Over The Work As Part Of The Document Part Of The Contract, C) Project Documentation On The Measuring Pillars Will Be Submitted For Approval By The Customer, D) Ensuring The Necessary Approaches, E) Every 2 Years Of Convening Negotiations With The Client And Presentation Of The State Of Monitoring, In The Last Date Of Performance Will Be Submitted Summary For The Period Of The Whole Monitoring F) Processing Identification And Evaluation Of Risks Related To The Safety And Health Of Persons At The Workplace
Contact Information
Address
Bezručova 4219
Contact No.
+420 474636276
Email
sulcova@poh.cz
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 91843508
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.