Supply And Installation Of Workplate With Galvanized Plate And Wood Structure. Af_03/2022_Ps, Container Rental 2, 30 X 6, 00 M, Alt. 2, 50 M, With 1 Sanitario, For Office, Complete, Without Internal Partitions (Does Not Include Mobilization/Demobilization), Mechanized Ditch Excavation With Prof. Up To 1, 5 M (Average And Downstream/A Composition Per Stretch), Excavator (0, 8 M3), Width. Less Than 1, 5 M, In 1St Category Soil, In Places With High Level Of Interference. Af_09/2024, Ditch Background Preparation With Width Less Than 1, 5 M (Natural Soil Hit). Af_08/2020, Concrete Tube For Rainwater Collection Networks, 400 Mm Diameter, Rigid Joint, Installed In A Low Interference Level - Supply And Settlement. Af_03/2024, Concrete Tube Settlement For Rainwater Collection Networks, 500 Mm Diameter, Installed In A High Level Of Interference (No Supply). Af_03/2024, Manual Ditches, With Percussion Soil Compactor. Af_08/2023, Execution Of Machined Concrete Gutter, Molded In Loco In Straight Stretch, 45 Cm Base X 10 Cm Height. Af_01/2024, Simple Rectangular Wolf Mouth Box, Masonry With Concrete Blocks, Internal Dimensions: 0, 6X1x1, 2 M. Af_12/2020, Rectangular Visit Well Base For Drainage, Internal Dimensions = 1X1 M, Depth = 1, 40 M, Excluding Buffer. Af_12/2020_Pa, Casting Iron Circular Put For 60 Cm Diameter, Class 400, Including Settlement, Exclusive Business Well. Af_09/2024, Execution Of Pavement On Interlocked Floor, With 25 X 25 Cm Hexagon Block, Thick 8 Cm. Af_10/2022, Guide Settlement (Curb) In Straight Stretch, Made Of Prefabricated Concrete, Dimensions 100X15x13x30 Cm (Length X Lower Base X Upper Base X Height). Af_01/2024, Manual Ditch Excavation. Af_09/2024, Galvanized Metallic Support For Warning Plate Or Regulation Side Or Diameter 0, 60 M, Supply And Installation, Steel Warning Plate, Side Of 0, Type I + Si Retroreflexive Film, Supply And Installation., Plate 20 X 35 Cm In Enameled Plate For Identification Of Public Places, Floor Painting With Epoxy Paint, Manual Application, 2 Coats, Included Epoxy Primer. Af_05/2021, Mechanical Compaction Of Soil For Radier Execution, Concrete Floor Or Slab On Soil, With Vibratory Plate Soil Compactor. Af_09/2021, Execution Of Ride (Sidewalk) Or Concrete Floor With Concrete Molded In Loco, Made On Work, Conventional Finish, Not Armed. Af_08/2022, Alert Or Directional Podotal Floor, Concrete, Based On Mortar. Af_03/2024, Local Administration
|