General Construction Work For Pipelines - New Transmission Line From Copenhagen To Dragør (1). The Contract Includes The Establishment Of A 7.1 Km Long Transmission Line For Water With A Diameter Of Ø450 Pe100 Sdr 17. The Cord Will Extend Through The Municipality Of Copenhagen, Tårnby And Dragør. The Cord Is Connected To The Existing Water Supply In Asger Jorns Allé In The City Of Copenhagen And Continues Via Ørestad Boulevard And Otto Baches Allé To Tårnby Municipality. In Tårnby, The Cord Is Established Along Løjtegårdsvej And Further Through Oligfabriksvej, Munkebjergvej And Hjallerup Allé To Englandsvej, Where It Is Led Under Cph-Copenhagen Airport To Dragør Municipality. The Cord Is Hung In The Tunnel Construction. In Dragør, The Cord Continues Along Englandsvej To Hovedgaden And On To St. Magleby Waterworks, Which Will Be Converted Into A Booster Station In A Separate Project. The Cord Will Primarily Be Placed In Publicly Accessible Roads, Sidewalks And Bike Paths And Is Performed Mainly By Controlled Under -Drilling, With A Few Stretches Made As A Dug Gutter. The Water Line Will Generally Be Established At A Depth Of 1.2-3.0 Meters, Depending On Local Conditions And Existing Wires.
Contact Information
Address
Ørestads Boulevard 35
Contact No.
+45 27953810
Email
mbrd@hofor.dk
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 91832530
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.