1. The Subject Of The Contract Is To Accomplish The Task Entitled Construction Of A Water, Water Supply And Sanitary Sewage Treatment Station In Sztabin As Part Of The B3.1.1 Investment Investments In Sustainable Water And Sewage Management In Rural Areas, Covered By The National Plan To Rebuild And Increase Immunity .22. The Detailed Scope Of Planned Construction Works Is Included In The Design Documentation Constituting Annex 9 To This Specification. The Number Of Works Attached To Swz Are An Auxiliary. The Contractor Is Obliged To Thoroughly Check The Actual Amount Of Works With Design Documentation. Due To The Fact That The Contract For Construction Works Will Be A Flat -Rate Agreement, In The Event Of A Greater Amount Of Works In Any Predecessor, It Will Not Be Able To Be Considered Additional Works With An Additional Remuneration. Any Lack In The Pre -City Of Works Necessary To Perform Resulting From The Project Documentation Does Not Release The Contractor From The Obligation To Perform Them On The Basis Of The Project In The Contractual Price. 3. Below Are The Main Elements Of The Works Planned To Be Carried Out And Activities: 1) Construction Of A Water Treatment Plant In A Relay- Construction Of A Station Technology Building,- Construction Of External Installations,- Replacement Of Existing Deep Wells, Pumps, Discharges, Housing Equipment,- Network Construction Waterproof Waterless Method (At The Station)- Assembly Of Internal Water And Sewage Installations, Heating, Ventilation, Electrical,- Construction Of A Sewage Neutralizer From The Chloride Room,- Construction Of A Shelter For Power Generator,- Reconstruction And Expansion Of Water Treatment Technology For 45 M3/H Efficiency - Construction Of A New Fence With A Gate And A Gate- Construction Of A Three-Chamber Riser And Lymph Joint- Construction Of Two Expansion Tanks With A Capacity Of V = 150M3 Each With A Chamber Of Gatents And Foundations- Demolition Of The Existing Water Treatment Station Building- Land Development- Completing The Necessary Tests To Commissioning Of The Facility- Conducting Operating Tests To The Necessary Extent,- Launch And Start Of Suw Installations And Facilities,- Conducting Trainings Of The Employers Technical Staff In The Field Of Service, Operation And Health And Safety For Facilities That Are The Subject Of The Contract,- Obtaining All Documents And Meeting All Requirements Allowing To Transfer Object For Operation And Use- Development Of A Water Law Survey For Water Intake And Drainage Of Rushing Water Along With Obtaining A Water Permit On Behalf Of The Employer. 2) Construction Of A Water Supply And Sanitary Sewage System In Sztabin. - Construction Of Two Sections Of The Gravitational Sanitary Sewage System With Pvc Sn8 Dn 200 (Lita) Pipes With A Total Length Of L = 253.30M Along With Connections To The Border With The Road Lane With Pvc Pipes Sn8 Dn 160 (Lity) With A Total Length Of L = 37.20 M - Performing Necessary Tests To Put The Network For U
Contact Information
Address
Gmina Sztabin,Sztabin,16-310,Podlaskie,Pl843 - Suwalski
Email
ugsztabin@sztabin.ug.gov.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 91789660
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.