1. The Subject Of The Procedure And Contract Is The Selection Of A Contractor For Construction Works Related To The Completion Of The Investment Task Entitled: Modernization Of The Dragon Square At Ul. West , For The City Green Board In Krakow. 1.1 In Accordance With Art. 310 Of The Public Procurement Law, The Contracting Authority Provides For The Possibility Of Annulment Of The Proceedings In Question, If The Public Funds That The Employer Intended To Allocate To Finance All Or Part Of The Contract, Were Not Granted To Him. 1.2 The Subject Of The Procedure And Contract Is The Investment Related To The Implementation Of The Task Entitled -Viii-9/25 Modernization Of The Dragon Square At Ul. Zachodna, Zzm/O1.347/24 Revitalization Of The Dragon Square At Ul. Western.1.3 The Investment Area Is Located On Plot No. 87/52, P-34 Precinct, Podgórze Registration Unit.1.4 The Scope Of The Intention Includes The Demolition Of The Existing Safe Surface, Play Equipment, Small Architecture Elements, Preparatory Work, Purchase, Delivery And Assembly Of Elements Of Small Architecture , External Gym Equipment And Play Equipment With Secure Surfaces. 1.5 The Documentation Includes The Necessary Opinions, Arrangements And Decisions, Including A Certificate Of Lack Of Grounds For An Objection, By Way Of A Decision To Report The Intention To Perform Construction Works: Au-01-7.6743.906.2024 .Sst Of 30.07.2024 1.6 As Part Of The Order, The Basic Scope And Possibly The Scope Covered By The Option Of The Options, In Whole Or Part, Entitled To The Ordering Party Should Be Carried Out. With The Construction Of A Safe Surface Of Epdm, Gravel Surface With The Outskirts, Construction Of A Concrete Seat, A High Concrete Ed Barms, Regulatory Plaque Garbage Bin) .1.9 The Order In The Scope Of Options No. 2 Includes The Purchase, Delivery And Installation Of An Outdoor Gym Together With The Construction Of A Safe Surface With The Edges. 1.10 Order In The Scope Of Option No. 3 Includes Planting Green. 1.11 The Contracting Authority Reserves The Right To Take Advantage Of From The Right Of Options In Whole Or In Part Regarding The Scope Of Options No. 1, 2, 3 In Whole Or In Part, Specified, Among Others, In Art. 441 Of The Pzp Act, I.E. Increasing The Scope Of The Subject Of The Contract. Therefore, The Contracting Authority May, But Does Not Have To Order The Contractor To Perform The Order Covered By The Law In Whole Or In Part. The Contractors Are Not Entitled To The Options Not Using The Right By The Ordering Party, In Whole Or In Part, No Claims. The Contracting Authority Guarantees The Implementation Of The Basic Order. The Contractor Is Entitled To Remuneration For The Actual Scope Of The Subject Of The Contract. The Option Of The Option Applies To The Order Under The Completed Subject Of The Contract By The Contractor Of Construction Works And In The Field Of Greenery In Whole Or In Part. The Contracting Authority Makes It Possible To Exercise The Right Of Financial Capabi
|