1. The Subject Of The Contract Is The Execution Of Construction Works Aimed At Performing Partial Renovations Of Streets With A Bituminous Surface And The Liquidation Of Breakthroughs In The City Of Biała Podlaska In 2025.2. Name/Y And Code/Y Common Order Dictionary: (Cpv): 45233142-6 Road Repair Works; 3. The Scope Of Works Includes: 1) Partial Renovation In The Hot Technology With A Mineral-Asphalt Mixture Produced In The Bituminous Mass Factory, In Which The Following Works Include: A) Renovation With An Area Of Up To 1M2- Without Arm:- Removal ,- Thorough Cleaning Of The Dna And The Edge Of The Damaged Place,- Removal Of Water, Bringing A Damaged Place To The Air-Dry State,- Spreading The Dna And The Edge Of The Bump Or The Loss Of Hot Asphalt,- Manual Distribution Of The Bituminous Mass In Places Prepared For Repair In The Amount Of 100 Kg /M2 Prepared For Repair. , Layer Thickness After A Compaction Of 4 Cm, - Profiling And Density Of The Built -In Bituminous Mass, - Sealing The Connection Of The Renovated Bump Or Defect With The Existing Surface. Make A Self -Adhesive Rubber -Asphalt Tape For Sealing Joints, - Cleaning The Renovated Place From Rumosz And Other Unacceptance; B) Renovation Area Up To 5M2 - With Shoulder: - Sealing Or Forging Damaged Fragments Of The Surface In Places For Repair, Giving Damage The Shape Of A Straight Geometric Figure With Vertical Walls, - Thorough Cleaning Of The Dna And The Edge Of The Damaged Place, - Water Removal, Supplying A Damaged Space To The Air -Sucha. , - Spreading Dna And The Edges Of The Bump Or Defect With Hot Asphalt, Subject To Dk 2 (City Beltway) And Along The Provincial Road (Streets: Janowska, Zamkowa, Łomaska, Wittoroska And Lubelska), Sprinkling Dna And The Edge Of The Designed Surface Asphalt Emulsion In The Amount Of 0 , 5 Kg /M2, - Manual Distribution Of Bituminous Mass In Places Prepared For Repair In An Amount Of 100 Kg /M2, Layer Thickness After A Minimum Compaction Make The Surface With A Self -Adhesive Rubber -Asphalt Tape For Sealing Joints, - Cleaning Up The Renovated Place From The Rumosz And Other Dirt; C) Renovation With An Area Of 5M2 To 50M2 - With A Frame: - Seizure Of Damaged Fragments About Vertical Walls, - Thorough Cleaning Of The Bottom And The Edge Of The Damaged Place, - Removal Of Water, Bringing A Damaged Place To The Air -Dry State, - Spreading The Bottom And The Edge Of The Pothois Or The Loss Of Heated Asphalt With A Reservation - On Dk 2 (City Beltway) And Within The Provincial Road (Streets: Janowska, Zamkowa, Łomaska, Wittoroska And Lubelska), Dna Sprinkling And The Edge Of The Designed Surface Asphalt Emulsion In An Amount Of 0.5 Kg/M2, - Manual Or Mechanical (With A Bituminous Mass Puzzle). Quantity 100 Kg/M2, Layer Thickness After Compaction Of A Minimum Of 4Cm. If The Chosen, Defect Or Lowering In The Places Prepared For Repair Is With A Depth Of 4 Cm More, The Expansion Layer From The Bituminous Mass In The Amount Of 25 Kg/M2 For Each Centimeter Of
|