1. The Subject Of The Order Is The Installation Of Air Conditioning Devices In 27 Rooms Of The Inowrocław City Hall Building With Headquarters At Al. Ratuszowa 36. The Scope Of The Order Includes Rooms On The Second Floor And Several Rooms On The First Floor Of The Building With Numbers: 105, 112, 114, 115, 116, 202, 203, 204, 205, 206, 207, 208, 211, 212, 212, 213, 214, 215, 216, 217, 218, 219, 220, 221, 222, 223, 224, 225, In Accordance With The Design Documentation, A Pre -Works Of Works And Technical Specification Of Construction And Acceptance Of Construction Works. The Building Is Located In The A Zone Of Conservation Protection Designated In The Local Spatial Development Plan. 2. The Scope Of Works Includes: 1) Construction Works, Including Puncture, Vertical Housing; 2) Delivery And Assembly Of Air Conditioning Devices: A) The Contractor Providing Air -Conditioning Devices; B) Assembly Of The Aggregate With A Steel Structure; C) Installation Of The Internal Unit; D) Assembly On The Walls Of Pipelines Of Soldered Copper Pipelines; E) Insulation Of Pipelines With Synthetic Rubber Bufts; F) Mounting The Sewage Valve; G) Assembly Of Anti -Spapid Siphons; H) Attempt At The Tightness Of Devices And Installation Of The Circuit Circulation Of Freone; I) Delivery And Supplementation Of The Air Conditioner System Freon; J) Filling The Devices And Installations Of Freon Circuit And Similar Factors Refrigerant; K) Starting And Obtaining Low Temperatures; L) Painting The Outdoor Unit (Fitting The Facade In The Color); 3) Execution Of Internal Supply Lines; 4) Installation Of Drivers, Including: A) Assembly Controller With Installation Can; B) Laying Cables In Troughs And Electrical Installation Channels; C) Mechanical Forge Of Furrows For Internally Cables; 5) Installation Of Wall Switchgears With Measurement And Checking; 6) Installation Of Masking; 7) Heating Cable Assembly; 8) Painting Renovation Works: A) Manual Preparation Of Cement-Lime Mortar; B) Frozing Furrow ; C) Internal Two -Layer Plaster Coats On The Ceilings; D) Painting With Emulsion Paints Twice Internal Surfaces; 9) Final Works Including Cleaning And Organizing The Rooms After Completing Works Within The Works. 4. A Detailed Description Of The Subject Of The Contract Is Contained In Design Documentation, Bill Of Quantities And Technical Specification Of Construction And Acceptance Of Construction Works (Stwiorb), Constituting Annex 11 To This Swz And Its Integral Part.
|