Construction Work For Swimming Pool - Construction Of A Swimming Pool In Piekary Śląskie. 1. The Subject Of The Order Is The Construction Of A Complete Building Of An Indoor Sports Swimming Pool Equipped With 8 Swimming Lanes, 25 M Long, With An Additional, Separate Shallow Basin, Equipped With Play Equipment For Children. The Sports Pool Will Be Equipped With A Movable Bottom Of Two Swimming Lanes, Separated From The Rest Of The Swimming Pool By A Movable Bulkhead. The Order Also Includes The Necessary Remaining Infrastructure Of The Swimming Pool Building, In Particular: Sports, Locker Room, Sanitary, Communication, Technical, Technological, Warehouse, Social, As Well As Changing Rooms And Swimming Pool Facilities (Level -1: Basement, Swimming Pool Technology, Technical And Technological Facilities, Sub-Pool Hall , Rooms, Technical And Technological Installations And Equipment, Social Rooms, Level 0: Swimming Pool Hall, Sanitary, Cloakroom, Entrance And Sports Areas, Social, Level +1: Technical Part, Administration, Level +2: Roof, Renewable Energy Sources). The Building Will Be Equipped With The Necessary Installations And Devices, In Particular: Sanitary, Electrical, Water And Sewage, Ventilation, Low-Current, Bms, Fire Protection, Technological, Swimming Pool Technology, Lighting, Evacuation, Technical And Renewable Energy Sources. The Task Should Also Include The Necessary Land Development, In Particular Parking Lots, Sidewalks, Access Roads, Communication, Land Development, Connections, Installations, Devices, Small Architecture, Green Areas And Other Necessary Technical And Accompanying Infrastructure. 2. A Detailed Description Of The Subject Of The Order Is Included In Annex No. 7 To The Swz. 3. The Ordering Party Included The Requirements Regarding Accessibility For Disabled People In The Description Of The Subject Of The Contract Constituting Annex No. 7 To The Contract Documents. 4. Due To The Lump-Sum Nature Of The Settlement, The Description Of The Subject Of The Order Does Not Include The Bill Of Quantities. 5. The Contractor May Entrust The Execution Of Part Of The Order To A Subcontractor. 6. The Contractor Will Be Obliged To Provide At Least 5 Years Of Warranty And Guarantee For The Entire Subject Of The Contract, Counted From The Date Of Fault-Free Acceptance Of The Entire Subject Of The Contract. 7. Main Item According To The Common Vocabulary Of Public Procurement: Cpv 45212212-5 Construction Works In The Field Of Swimming Pools 8. The Order Was Not Divided Into Parts. Such An Artificial Division Would Require The Separation Of A Coherent Whole In The Form Of A Large Construction Project Covered By One Development Area And A Uniform Function. Additionally, This Is Indicated By The Conditions Of The Polish Order Program, From Which The Ordering Party Obtains Funding For The Implementation Of The Order. The Ordering Party For The Investment Received A Preliminary Promise Covering The Entire Subject Of The Order. If The Order Was Divided Into Parts And One Of Them Failed, The Ordering Party Would Be At Risk Of Losing Financing For The Entire Order. The Subject Of The Contract Is The Construction Of A New Facility, Dividing The Contract Into Parts For Such A Project Would Cause Difficulties In Coordinating The Activities Of Different
|