River Regulation And Flood Control Works – Ve304 Tiefbauarbeiten Ba 3.1. Dike And Road Construction Work • Earthworks: New Dike Construction Approx. 95,000 M³, Raising/Widening Road Body Approx. 18,500 M³, (Mentioned Cubatures Mostly Delivery Material) • Sealing Wall Work: Approx. 11,200 M² (Of Which Approx. 1,300 M² Sheet Pile Wall) • Road Construction (Area Of Asphalt Surface Layer): Approx. 9,000 M² • Road Construction (Gravel Paving): Approx. 17,000 M³ • Sowing Work On Approx. 80,000 M² • Topsoil Work (Covering): Approx. 14,000 M³ • Topsoil Transfer To Arable Land: Approx. 28,000 M³ Buildings And Pipeline Construction Work: • New Construction Of 2 Sluice Structures, Construction Pit Shoring (Sheet Piling) : Approx. 1,700 M². Reinforced Concrete Work: Approx. 150 M³ • Dike Crossing Structures (Division Crossings): 1 Pc. Drinking Water Pipe Crossing 1 Pc. Field Drainage Pipe Crossing 1 Pc. Wastewater Pressure Pipe Crossing • New Construction Of Flood Protection Wall Reinforced Concrete Work: Approx. 250 M³ • Pipe Construction Work: Approx. 2,300 M With Dn 150 To Dn 500 (Of Which Approx. 890 M Reinforced Concrete Pipes) And Approx. 40 M Of Siel Pipeline Dn 1000 • Removal And Reinstallation Determined. Telecom Line (Cable Protection Pipe Dn 110) Over A Length Of Approx. 800 M • Dewatering Required For The Construction Of The Sewer And Crossing Structures As Well As Trench Construction Work
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 91728403
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.