The Subject Of The Contract Is The Construction Of An Internal Hydrant Installation Along With A System For Lifting Pressure And Water Efficiency In The Designed Hydrophore Room In The Facility: School And Preschool Complex No. 1 In Jaworzno Ul. Matejki 3. In The Scope Of Works Covered By This Contract, The Works In The Scope Of: 1) Sanitary Installations: Works Include: Construction Preparatory Works Consisting Of Preparing A Room For Fire Protection Hydrophore, Separation Of The Room With Walls With Fire Resistance Ei 120, Installation Of The Ei 60 Door, Well -Being Dripping, Floor Renovation, Painting And Plastering Robots, Ensuring Anti -Corrosion Protection And Warmer Insulation Made Of A Hydrant Installation. Installation Preparation Works - A Ventilation Channel And Building A Exhaust Fan On It. Disassembly Of Existing Hydrants And Approaches To The Hydrant Pawns In The Basement, Reconstruction Of The Existing Water Meter Junction - Separation Of The Municipal And Fire Water Supply System. Installation Of Water Meters, Anti -Spy Valves And Priority Valve And Shut -Off Valves, Pierce In Walls And Ceilings, Assembly Of Protective Sleeves. Making Recesses For Hydrant Cabinets, Assembly Of Pipelines From Steel, Thin -Walled Pipes, Galvanized On Both Sides, Connected To The Clamp, Assembly Of Hydrants, Performing Tightness Test, Assembly Of The Pump Set, Assembly Of A Spatial Pump In A Drip Pump, Making A Pre -Pipeline With A Pipeline With The Existing Sewage System, Performance Of Fire Protection In Places Of Crossing Walls And Ceilings, Fire Separation Of Designed And Existing Pipelines, Bricking Recesses After Dismantled Hydrant Cabinets, Execution Of Installations, Starting Installations With Performance Measurements. 2) Electrical Installations: Work Includes: Execution Of Internal Supply Lines, Assembly Of Prefabricated Electrical Switchgears, Execution Of Lighting Installations, Plug Sockets And Forces, Embedding Cans, Laying And Fixing Wires, Preparing Vein Ends And Connecting Wires, Assembly Of Basic Lighting Fixtures, Assembly Of 230V Plug Sockets, Connectors, Buttons, Assembly Of Evacuation Luminaires, Installing Evacuation Lighting, Execution Of Walls And Ceilings , Execution Of Compensatory Connections And Assembly Tests, Material Quality Control, Quality Control Of Works. Pursuant To: 1. Technical Design: Execution Of An Internal Hydrant Installation With A Set For Lifting Pressure And Water Efficiency In The Designed Hydrophore Room In The Facility: School And Preschool Complex No. 1 In Jaworzno Ul. Matejki 3. - Sanitary Industry, June 2024 Constituting Annex 1 To Swz, 2. Technical Project: Execution Of The Internal Hydrant Installation With A Set For Lifting Pressure And Water Efficiency In The Designed Hydrophore Room In The Facility: School And Preschool Complex No. 1 In Jaworzno Ul. Matejki 3.-Electrical Industry, June 2024. Constituting Annex 2 To Swz, 3. Technical Technical Designer For The Implementation Of An Internal Hyd
|