Fire Station Construction Work – Kaltübungshaus Fwt. In The Steel-Concrete Building, Which Is Modeled On An Apartment Building With A Basement, Ground Floor, 1St Floor, Top Floor (A Total Of 12 Rooms + Stairwell + Balconies), The Following Things Are To Be Simulated: - Searching Smoke-Filled Rooms For People - Locating Fire Spots ( Simulated By So-Called Fire Fakes) - Tactical Approach And Operation Of A Fire Alarm System - Pumping Out Flooded Cellars After Heavy Rain Events - And Other Training Scenarios The Technical Room In The Top Floor Contains An Electrical Sub-Distribution Installed On Site In Which The Individual Circuits Are Protected And The Control Of The Exercise House Is Housed. In Addition, There Is A 19 Computer Cabinet In The Technical Room For Installing The Audio Control. All Audio Cables Converge In A Star Shape In This It Cabinet. The Cold Training House And The Training Tank Should Be Able To Be Controlled Via A Tablet. The Following Trades Are To Be Implemented, Among Others - Ventilation System For Cold Smoke Extraction - Misting Of The Practice Rooms With Accessories - Control Of The Practice House - Practice Objects And Accessories - Light And Acoustic Equipment Of The Practice Rooms - Mobile Practice Room Partition Walls With Accessories
Contact Information
Contact No.
+49 2761810
Email
vergabe@kreiswerkeolpe.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 91682646
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.