1.1.1.1 Rockfill Of Thrown Stone - Commercial Hand Stone - Supply And Laying, 1.1.1.2 Mechanical Demolition Of Reinforced Concrete, Using Hydraulic Excavator With Hydraulic Hammer - Without Reuse, 1.1.1.3 Manual Demolition Of Wooden Constructions - Without Reuse, 1.1 .1.4 Load, Maneuvering And Unloading Demolished Material In A 6 M³ Dump Truck - Loading With A 1.72 M³ Loader And Free Unloading, 1.1.1.5 Transport With A 6 M³ Dump Truck - Rodovia Em Leito Natural, 01/24/2025, 1.1.1.6 Regularization Of Bota-Fora With Spreading And Compaction, 1.2.1.1 Root Pile Drilled Into The Ground With D = 40 Cm - Construction, 1.2.1.2 Root Pile Drilled Into The Rock With D = 31 Cm - Construction, 1.2.1.3 Drilling Of Concrete Piles With Diameter Or Width = 40 Cm, 1.2. 1.4 Bored Pile Frame Or Diaphragm Wall In Ca-50 Steel With Crane Support - Supply, Preparation And Placement, 1.2.1.5 Metallic Liner With A Thickness Of 6.3 Mm D = 500 Mm - For Water Sheet Passage - Positioning, 1.2.1.6 Nautical Support For Placement Of The Frame In Metallic Jacket, 1.2.1.7 Nautical Support For The Excavation With Drill, 1.2.2.1 Excavation, Loading And Transport Of 1St Category Material - Dmt From 50 To 200 M - Paved Service Path - With Excavator And 14 M³ Dump Truck, 1.2.2.2 Compaction Of Landfills At 100% Of The Proctor Normal - Blocks And Encounters, 1.2.2.3 Recomposition Mechanized Landfill With Deposit Material, 1.2.2.4 Landfill Material, 1.2.3.1 Excavation, Loading And Transport Of 2Nd Category Material - Dmt From 1,000 To 1,200 M - Service Path On Natural Bed - With Loader And 14-Inch Dump Truck M³, 1.2.3.2 Nautical Support For The Execution Of Concreting Metal Liners, 1.2.3.3 14 Mm Plasticized Plywood Formwork - General Use - 2-Time Use - Production, Installation And Removal, 1.2.3.4 Ca-50 Steel Frame - Supply, 1.2.3.5 Concrete For Pumping Fck = 30 Mpa - Production In A 30 Batching Plant M³/H - Commercial Sand And Crushed Stone, 1.2.3.6 Mechanical Casting Of Concrete With Boom Pump On Chassis With Capacity Of 50 M³/H - Production In 40 M³/H Batching Plant, 1.3.1.1 Chartered Neoprene Support Device For Pre-Structures -Moulded - Supply And Installation, 1.3.2.1 Concrete Fck = 15 Mpa - Construction In Concrete Mixer And Manual Launching - Commercial Sand And Crushed Stone, 1.3.2.2 14 Mm Plasticized Plywood Formwork - General Use - 2-Time Use - Production, Installation And Removal, 1.3.2.3 Ca-50 Steel Frame - Supply , 1.3.2.4 Concrete For Pumping Fck = 30 Mpa - Production In A 30 M³/H Batching Plant - Commercial Sand And Crushed Stone, 1.3.2.5 Mechanical Casting Of Concrete With A Pump Boom On A Chassis With A Capacity Of 50 M³/H - Production In A 40 M³/H Batching Plant, 1.3.3.1 Forms Of 14 Mm Plastic Plywood - General Use - 2-Time Use - Manufacturing, 1.3.3.2 Ca-50 Steel Frame - Supply, 1.3.3.3 Concrete For Pumping Fck = 30 Mpa - Manufacturing In 30 M³/H Batching Plant - Commercial Sand And Crushed, 1.3.3.4 Mechanical Launching Of Concrete With Boom Pump About Chassis With Capacity Of 50 M³/H - Manufacturing In Central 40 M³/H Dosing Machine, 1.3.3.5 Propping With Spikes D = 10 Cm - 2-Time Use - Manufacturing, 1.3.4.1 10 Mm Plasticized Plywood Curved Forms - General Use - 2-Time Use - Manufacturing, 1.3.4.2 Frame In Ca-50 Steel - Supply, 1.3.4.3 Concrete For Pumping Fck = 30 Mpa - Manufactured In A Center
|