1. The Subject Of The Order Is The Construction Of A Rainwater Sewage System At Ul. Myśliwska In Tychy On The Plot 335/101. Construction Works Should Be Carried Out On The Basis Of A Construction Project, Technical Documentation, Executive Design And Stwirib Entitled: Construction Of A Rainwater Sewage System At Ul. Myśliwska By Sanpro Michał Góra, As An Auxiliary Material Bill Of Quantities. 2. The Scope Of The Subject Of The Contract Includes, Among Others:- Dismantling, Demolition Works,- Liquidation Of The Existing Rainwater Sewage System,- Construction Of A Section Of The Rainwater Sewage System,- Making Connections With Existing Street Inlets,- Development Of 5 Sets Of Concrete Wells With Hatches With Suppressing Inserts,- Performing Tightness Test,- Inspection With A Television Camera,- Reproduction Of The Surface,- Exports And Utilizations,- Obtaining A Technical Protocol From The Municipal Department, Environmental Protection And Agriculture. 3. The Contractor Is Obliged To Obtain Specialist Supervisors During Construction Works, Notify The Owners Of The Area Of The Area, Preparation, Obtaining, Assessing And Approval By The Relevant Institutions Of The Project Of Temporary Traffic Organization, Obtaining All Relevant Arrangements/Receipts Required By Law And Reporting. 4. As Part Of The Task, The Contractor Is Obliged To Obtain The Approval Of The Temporary Traffic Organization Project And To Introduce This Change And Maintain The Marking In Accordance With The Project Throughout The Entire Work. 5. As Part Of The Task, The Contractor Is Obliged To Perform As -Built Geodetic Inventory And Submit It To The Geodetic Documentation Center. 6. The Contracting Authority Informs That The Bill Of Quantity Of Construction Works Is Only An Auxiliary Document, I.E. The Information Basis For The Valuation Of The Investment In Question. 7. It Is Recommended That Each Of The Contractors Inspect The Place Of Planned Investment At The Stage Of Preparing The Offer To Check The Conditions In The Field. The Design Provision Is Annex 4 To Swz.A. In The Case Of Indications In The Documents Of The Order Of Trademarks, Patents Or Origin, Source Or Special Process, Which Characterizes The Products Or Services Provided By A Specific Contractor, The Contracting Authority Allows The Use Of Equivalent Materials Described. In The Event Of An Indication In The Description Of The Subject Of The Order Of Reference To Standards, Technical Assessments, Technical Specifications And Technical Reference Systems Referred To In Art. 101 Para. 1 Point 2 And Para. 3 Of The Public Procurement Law, The Contracting Authority Allows Equivalent Solutions Described. The Contractor, Who Refers To Equivalent Solutions, Is Obliged To Show That The Solution He Offers Meets The Requirements Set By The Contracting Authority. In This Case, The Contractor Attach To The Offer Documents Confirming The Equivalence Of The Offered Solutions. The Burden Of Proving Equivalence Rests With The Con
|