The Order Includes The Expansion Of The Sanitary Sewage System With Connections In The City. Skids In Nw. Scope: Expansion Of The Sanitary Sewage System In The Town Of Płozy, Plot No. 3/3, 3/5, 3/12, 4/10, 4/11, 5/3, 5/7, 5/18, 6/6, 7 /8, 7/9, 7/13, 7/14, 7/20, 7/21, 8/19, 9, 13/4, 15/5, 15/6, 15/7, 15/9, 16, 17/2, 18, 19, 20, 23/3, 23/4, 24, 25, 29/32, 32/1, 33/ 5, 37/1, 37/2, 38, 39/1, 39/3, 41/26, 46/2, 46/3, 47, 49/1, 50/2, 51, 55/6, 56/8, 58/1, 58/5, 59/3, 59/6, 60/ 3, 60/4, 61/1, 61/2, 62, 63, 64/2, 65, 67/3, 67/9, 67/10, 75/2, 83/1, 83/2, 87/1, 89/1, 89/2, 92/1, 93/2, 94, 95, 95A, 98, 98A, 99, 108/5, 109, 110, 111/1, 111/2, 112, 113/13, 113/19, 113/21, 114/2, 114/5, 114/6, 114/7, 114/12, 114/16, 114/17, 114/18, 114/22, 114/27, 115/3, 115/10, 115/11, 118/7, 277/6, 3265/1, 3277/9, 3277/10 Geodetic Area. Skids. The Task Includes The Implementation Of: Gravity Sanitary Sewage Network And Connections: - Pvc-U Pipes, Type Sn8, Diameter. 200Mm – 7,201.90M- Pvc-U Pipes, Type Sn8, Diameter. 160Mm – 805.60M- Reinforced Concrete Sewage Wells With A Diameter Of 1000Mm – 13 Sets - Reinforced Concrete Sewage Wells With A Diameter Of 1200Mm - 7 Sets - Plastic Sewage Wells With A Diameter Of 425Mm - 253 Sets - Reconstruction Of The Surface Of Gravel Roads - 21,379.00 M2 - Reconstruction Of The Surface Of Asphalt Roads - 1,105.00 M2 Pressure Sanitary Sewage Network - Pe100 Sdr11 Pn10 Pipes Dn90mm - 449.7M - Pe100 Sdr11 Pn10 Dn90mm Pipes Rc – 56.00M- Pe100 Sdr11 Pn10 Pipes Dn110mm – 942.60M- Sewage Pumping Stations (Network) – 8 Sets. Detailed Scope Of The Above. Works To Be Performed, Was Specified In The Design Documentation, Technical Specifications For The Execution And Acceptance Of Works, And Bills Of Quantities, Which Constitute Appendices To The Swz. The Bills Of Quantities Attached To The Swz Are Not Binding And Constitute Only Auxiliary Material For The Contractor, Who In Order To Prepare The Offer Should Prepare His Own Bill Of Quantities Based On The Construction Design. Design Documentation, Technical Specifications For The Execution And Acceptance Of Works, And Bill Of Quantities Cover The Entire Investment Task.
|