The Order Covers The First Stage Of The Expansion Of Ul. Północna, Consisting In The Construction Of A Roundabout At The Intersection Of Ul. Północna From Ul. Błońska In Pruszków Along With Technical Infrastructure. The Road Part Included The Complete Demolition Of Existing Surfaces, Earthworks, And Then The Construction Of New Road Surfaces, Roundabouts, Bus Platforms, Public And Individual Exits, Pedestrian And Bicycle Routes And Sections. A Bicycle Path, Sidewalks With Various Surfaces, Along With The Introduction Of Road Safety Elements And Permanent Traffic Organization. The Network Works Included The Demolition Of Elements Of The Existing Storm Sewage System And The Comprehensive Construction Of A New Gravity Street Drainage Network. The Investment Also Includes The Demolition Of The Existing Lighting Infrastructure, I.E. Luminaires And Power Line From Pge Poles, And The Construction Of New Pole-Mounted Street Lighting Powered By An Autonomous Cable Line, As Well As The Construction Of A Section. Technological Channel (Telecommunication Sewage). The Removal Of Conflicts With Technical Infrastructure Included The Reconstruction Of The Section. 0.4 Kv Lv And 15 Kv Mv Power Grids And The Reconstruction Of The Cable Telecommunications Network. An Additional Element Included In The Study Is The Recultivation Of Lawns Damaged As A Result Of The Above-Mentioned Works And The Planting Of High And Low Greenery. The Section Includes The Reconstruction Of Fences Colliding With The Road System. Additionally, The Section Includes The Valuation Of Works Should Take Into Account: - Monitoring Of Constructed Rainwater Channels, - All Related Costs With: Execution And Introduction Of Temporary Traffic Organization, Switching Off The Power Supply To Power Lines, Supervision And Acceptance Of Works By The Managers Of The Rebuilt Installations, Obtaining Consent For Use From The Relevant Construction Supervision Inspector. The Installed Lighting Fixtures Must Meet The Following Requirements: - Fixture Equipped With A Zhaga Socket On The Top Or Bottom Cover To Enable Adaptation Of The Fixtures To Remote Control In The Future, - Lighting Fixtures With Factory-Set Power Reduction According To Diagram:1. From The Moment The Luminaires Are Turned On Until 11 P.M. - 100%2. From 11 P.M. To Midnight – 70%3. From Midnight To 4:00 – 50%4. From 4:00 To 5:00 – 70%5. From 5:00 Until The Luminaire Is Turned Off - 100%
Contact Information
Address
Gmina Miasto Pruszków,Pruszków,05-800,Mazowieckie,Pl913 - Warszawski Zachodni
Email
przetargi@tbszm.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 91579102
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.