Project Co-Financed By The European Social Fund Plus, Under The European Funds For Małopolska 2021-2027 Program, Priority 6 European Funds For The Labor Market, Education And Social Inclusion, Measure 6.21 Support For Social Services In The Region, Project Type E. Crisis Intervention Services .1. The Scope Of Construction Works Includes In Particular: A) Demolition Of The Existing Free-Standing External Chimney, B) Demolition And Backfilling Of Existing Shafts And External Chute, C) Demolition Of Existing Internal Walls And Cement Floor On The Ground Floor, D) Dismantling Of Existing And Construction Of New Electrical Installations And Sanitary Facilities,E) Construction Of Telecommunication Installations,F) Construction Of An Inter-Story Ceiling,G) Construction Of New Partition Walls,H) Disassembly Of The Existing One And Assembly New External And Internal Windows And Doors, I) Installation Of Internal And External Window Sills, J) Removal Of Existing And Installation Of New Internal And External Plasters, K) Installation Of Wall And Floor Coverings With Stoneware And Ceramic Tiles, L) Installation Of Floor Coverings With Pvc Carpets ,M) Insulation Of The Flat Roof,N) Construction Of External Stairs And A Ramp For Disabled People,O) Construction Of A Roof Over The Main Entrance,P) Execution Measurement Of Electricity Consumption, Central Heating And Utility Water, Q) Construction Of A Sidewalk Made Of Paving Stones, R) Construction Of A Recreational Square, S) Construction Of A Panel Fence For A Recreational Square. The Subject Of The Order Also Includes: • Surveying Services, • Commissioning Of The Installed Installations, • User Training, • Obtaining All Permits And Decisions Required By The Provisions Of Construction Law Enabling The Ordering Party To Obtain A Decision On The Permit To Use The Facility In Question.2. Place And Method Of Carrying Out Construction Works: A) Place Of Carrying Out Construction Works: The Building And The Area Of The School Dormitory Of The Secondary School Complex. Wincentego Witos In Nawojowa Located At Ul. Podkamienne 8, 33-335 Nawojowa (Registered Plot No. 157/51, Nawojowa District, Nawojowa Registry Unit, Nawojowa Commune, Nowy Sącz Poviat, Lesser Poland Voivodeship). The Plot Area And The Building In Which Construction Works Will Be Carried Out Are Used In Accordance With With Their Purpose By The Secondary School Complex. Wincenty Witos In Nawojowa. The Statutory Activities Of The Facility Will Not Be Suspended For The Duration Of The Order Indicated In Point Iv.2 Of The Swz. The User Does Not Conduct Any Business In The Part Of The Dormitory Building Subject To Reconstruction. B) Method Of Carrying Out Construction Works:• The Contractor Is Obliged To Carry Out The Works In A Way That Ensures The Safety Of Persons Present On The Site Of These Works;• The Contractor Is Obliged To Mark The Place Of Work Being Performed And Protect It Against Access By Unauthorized Persons;• The Contractor Is Obliged To Ens
|