Architectural, Construction, Engineering And Inspection Services – Campus Dok Specialist Planning Technical Equipment Hlsm. The Bundeswehr And Federal Construction Are Taking New, Collaborative Approaches To The Renovation, Expansion And Further Development Of The Hsu Campus. The Hsu Currently Offers 29 Degree Programs In The Areas Of Natural And Engineering Sciences As Well As Economics, Humanities And Social Sciences. The Hsus Current Building Stock, Excluding The Accommodation Buildings And Swimming Pool, Which Are Not Part Of The Campus Development, Comprises A Gross Floor Area (Gfa) Above Ground Of Around 88,000 M² And A Gross Volume Volume (Bri) Of Around 470,000 M³. The Property Is A Military Security Area And The Current Construction Project Is Classified As Open. The Existing Buildings, Which Date From The Mid-1970S And Are Characterized By A Striking External Steel Hanging Structure, And The Outdoor Areas Are Protected As Monuments And Ensembles. The Planning And Construction Work Will Take Place During Ongoing Operations And Is Scheduled To Be Completed In 2035. Before The Actual New Construction And Renovation Work Begins, Allianz Provides Preparatory Measures With Regard To The Infrastructure. The Highly Complex Planning And Construction Task Is Processed As Part Of Integrated Project Management (Ipa). All Planning And Construction Stakeholders Relevant To The Project Are Bound As An Alliance By A Multi-Party Contract And Work Together In Cross-Functional Teams From The Start. Through Profit Sharing, All Partners Benefit Together From The Success Of The Project. The Collaboration Relies On Collaboration And Trust, Transparency And Openness As The Basis For Joint Action. Lean Methods Are Used That Make Planning And Construction More Efficient And Faster. The Relevant Contractual Regulations Are Summarized In The Key Points Paper, Which Is Part Of The Tender Documents For The Participation Competition. A Total Of 9 Partners Are Commissioned (See Above). As Part Of Master Planning, The Main Topics Of Architecture And Urban Development, Open Space, Energy And Sustainability Were Dealt With And The Urban Planning Framework Was Defined. This Plan Will Now Be Further Developed. In The Area Of Architecture And Urban Development, The Alliance Will Work On The Following Buildings: H1 (Main Building, Primarily Teaching, Administration, Office Use): Renovation, Partial Demolition And Addition Of Two New Buildings; Canteen: Renovation; House 1 Mbau | Bauing (Institute Building, Primarily Teaching, Research, Workshop, Laboratory): New Building; House 2 Mbau | Bauing (Institute Building, Primarily Teaching, Research, Workshop, Laboratory): New Building; House 3 Mbau | Bauing Including Central Workshop And Test Halls (Workshops And Test Halls, For Teaching And Research): New Building; House 4 Electrical Engineering (Institute Building, Primarily Teaching, Research, Workshop, Laboratory, Data Center): New Building; Library (Library And Teaching): New Building; Auditorium A1: New Building; Sports Center S1 (Addition To The Existing Swimming Pool With A Three-Field Sports Hall): New Building; Mobility Hub Including Parcel Station, Delivery, Material Storage And Danger
|