The Subject Of The Order Is The Construction Of A Bridge Over The Ciemięga River Along An Internal Road With Access Roads In Pliszczyn, Wólka Commune. Listed Below Are The Main Features Of The Item And Approximate Quantities:1. Dimensions Of The Internal Road And The Main Scope Of Road Works: - Length Of The Section Under Construction: Approximately 160 M, - Width Of The Bituminous Road 3.0 M, (With One Passing Lane 5.0 M Wide), - One-Sided Sidewalk Made Of Paving Stones, 1.5 M Wide, - Construction Of An Exit From The District Road To The Internal Road, - Construction Of 1 Individual Exit, - Hardening Of The Roadside With Aggregate, - Laying Prefabricated Sewage Total Length Of Approximately 33 M, - Installation Of Vertical Markings, - Removal Of The Mesh Fence And Erection Of A New One, 1.5 M High And 103 M Long, - Securing The Telecommunications Cable With An 8 M Two-Part Protective Pipe. Basic Road Structure: - Wearing Course Of Asphalt Concrete Ac12s 50/70 - 4 Cm,- Binding Layer Of Asphalt Concrete Ac16w 50/70 - 5 Cm,- Basic Base Made Of A Mixture Of Cement-Bound Aggregate C3/4 - 18 Cm - Auxiliary Layer Made Of A Mixture Of Cement-Bound Aggregate C1.5/2 - 25 Cm Basic Structure Of The Pavement: - Wearing Course Made Of Concrete Cubes, Thickness. 6Cm, - Cement-Sand Backfill, - Basic Base Made Of A Mixture Of Cement-Bonded Aggregate C1.5/2 - 15Cm - Framed With An Edge And Curb.2. Bridge Dimensions And The Main Scope Of Bridge Works: - Steel Structure Bridge Made Of Corrugated Sheets With A Box Section Of 8.60X2.32 M, 7.03 M Long, - Foundation On Reinforced Concrete Driven Piles 30X30 Cm, 8M And 11M Long, - Span Span 8 ,75M,- Horizontal Light 8.6M,- Construction Width 7.02 M, - Bituminous Road, Width 3.0 M, - Sidewalk Cover With Anti-Slip, Chemically Hardened Surface (Pedestrian Path, Curb, Barrier, Cornice) Width 2.68 M, - Left Cover (Curb, Strip, Barrier, Cornice) Width. 1.34 M, - Strengthening The River Bed With Mesh And Stone Mattresses Stone Riprap, - Strengthening The River Slopes With A Palisade Of 95 M Pegs, - Demolition Of The Existing Steel Structure Bridge With A Surface Of Concrete Slabs (Road Slabs From The Old Bridge To Be Handed Over To The Ordering Party With Delivery Up To 10 Km And Unloading).3. The Subject Of The Order Also Includes: - Provision Of Full Geodetic Services At The Contractors Expense In Terms Of Marking Out, Measurements And Preparation Of As-Built Geodetic Documentation, Preparation Of A List Of Ground Changes, If Any, And Reconstruction Of Any Disturbed Points In The Geodetic Control Network; - The Contractor Also Bears Any Costs Related To The Technical Acceptance Of The Works By Network Managers. Excess Soil To Be Developed By The Contractor On His Own.4. The Minimum Required Warranty And Guarantee Period Is 36 Months (Offer Evaluation Criterion).
|