The Subject Of The Order Is The Repair Of Outdoor Swimming Pool Basins And The Replacement Of Sanitary Fittings - Outdoor Showers In The Swimming Pool Complex At Ul. 3 - Maja 50 In Polkowice. In The Sports Basin: 1. Preparation Of The Basin For Lining The Pool With Pvc-P Foil, 2. Lining The Pool With A New Pvc-P Foil, 3. Installation Of A New Angle Covered With Pvc-P Foil On The Edge Of The Pool And In Corners At The Bottom, 4. Disassembly Of The Old System Overflow Gutter With Drains, 5 Overflow Gutter With A New System Trough And Covering With Pvc-P Foil And Pvc-P Anti-Slip Foil, 6. Installation Of New Drains In The Overflow Gutters, (20 Pcs.), 7. Disassembly Of Old Bottom Pressure Nozzles, (45 Pcs.), Pressing Bottom Lamps, (45 Pcs.),9. Disassembly Of Old Lamps, (10 Pcs.),10 Plugging The Places Left By The Lamps From Point 9 (Holes Leveled With Concrete Mass And Covered With Pvc-P Foil), 11. Sealing (20 Pcs.) Drains From The Overflow Gutter, Water Drain (3 Pcs.), Etc. 12 Pvc-P, Diameter 50 Cm, 13. Black Strips Pvc-P Foil At The Level Of The Waterline, 14. Heating 8 Pieces Of Black Pvc-P Foil Marking The Waterways At The Bottom, 15. Disassembly Of Old Hooks For Surface Ropes Dividing The Waterways, (14 Pcs.),16. Installation Of New Hooks For Surface Ropes Dividing The Waterways (14 Pcs). In The Mushroom Basin: 1. - Preparation Of The Basin For Lining The Pool With Pvc-P Foil,2. - Lining The Pool With A New Pvc-P Foil, 3. - Installation Of A New Angle Bracket Covered With Pvc-P Foil On The Edge Of The Pool And In The Corners At The Bottom, 4. - Dismantling The Old System Overflow Gutter With Drains, 5. - Lining The Overflow Gutter With A New System Trough And Covering With Pvc-P Foil And Pvc-P Anti-Slip Foil,6. - Installation Of New Drains In Overflow Gutters, (24 Pcs.), 7. - Disassembly Of Old Bottom Pressure Nozzles, (33 Pcs.), 8. - Installation Of New Bottom Pressure Nozzles, (33 Pcs.), 9. - Disassembly Of Old Lamps, (12 Pieces), 10. - Permanent Blinding Of Places Left By Lamps From Point 9 (Holes Leveled With Concrete Mass And Covered With Pvc-P Foil), 11. - Sealing (24 Pcs.) Of Drains From The Overflow Gutter, Water Drain (2 Pcs.), Etc.12. - Lining The Stairs With Pvc-P Foil And Pvc-P Anti-Slip Foil,13. - Heating Black Pvc-P Foil With A Diameter Of 50 Cm Around The Bottom Pressing Nozzles. Additional Works: 1. - Disassembly Of Old Shower Bowls, (9 Pcs.), 2. - Dismantling Old Showers With Overhead Showers, (9 Pcs.), 3. - Installation Of New Shower Bowls, (9 Pcs.), 4. - Installation Of New Showers With A Head Shower, (9 Pcs.). A Detailed Description Of The Subject Of The Order, Terms Of Implementation, Methods Of Payment, Etc. Are Specified In The Draft Contract Attached To This Specification, Constituting Annex No. 9 To The Swz, And A Detailed Description Of The Works Constituting Annex No. 1 To The Draft Contract.
|