For The Area In Question, Its Recultivation And Adaptation To Perform A New Recreational, Social And Service Function Should Be Designed, Through The Following Examples Of Buildings, Technical Devices And Elements Of Small Architecture, Including: A) A Building With A Meeting Room, A Kitchenette And A Toilet, A Storage Room Handy, Garden Tools Warehouse, B) Gazebo - Resting Place For Cyclists, C) Bicycle Racks For Adults And Children, D) Benches, E) Pergolas, Roofs, F) A Bocce Ball Court With Facilities For Renting And Storing Game Equipment, A Board With Game Rules, A Score Board, G) Sensory Devices/Sensory Path, H) A Place For Silence And Meditation, I) A Place For Playing Chess,J) Pop-Up Library,K) External Drinking Fountain,L) Sprinkler Curtain,M) Flower Beds, Rockery With Water, Bonfire/Barbecue,N) New Fence With A Gate And Wicket As Well As Separating Elements In The Places Of Existing Gates And Fences On Private Plots,O) Monitoring, Lighting, Three-Phase Installation For Connecting Mobile Services, E.G. Food Trucks,P) Planting Trees, Shrubs And Perennials,Q) Hardening Of Walking Paths, Walkways, Dance Platform,R) Information Board With Regulations,S) Water Supply, Sewage And Energy Connections, Internet, T) Exit, Parking Spaces.4.1.2 Scope Of The Study: A) Map For Design Purposes (3 Copies) B) Inventory To The Extent Necessary To Perform The Task, Including An Inventory Of Greenery (3 Copies) C) Necessary Expert Opinions, Opinions Technical, Geotechnical Research) Conceptual Designs Of Land Development With A Building Concept For Approval By The Ordering Party (3 Variants, 2 Copies Each); E) Construction Designs And Technical (Executive) Designs For Multiple Industries (3 E.G.):- Land Development Design - Architectural And Construction Design Of The Building, Land Development Elements And Small Architecture - Designs Of Necessary Connections, Including: Water, Sewage, Rainwater, Energy, Internet - Agreed With Media Suppliers/Recipients; - Technical Design (Execution) Along With A List Of Materials For Each Industry (4 Copies) (Industries Including: Construction, Construction, Road, Installation, Electrical Power); F) Submission, On Behalf Of The Ordering Party, To The Competent Architectural And Construction Administration Authority Complete Application For A Building Permit, Obtaining A Final Building Permit; G) Submitting, On Behalf Of The Ordering Party, Effective Notifications Of Construction Works For Areas That Are Not Part Of The Construction Design And Whose Execution Is Not Covered By The Building Permit Decision, But Is Necessary To Complete The Task (E.G. Connections, Collisions, Exits, Traffic Organization) Along With With The Documentation Developed By The Contractor And Attached For This Purpose; H) Preparation Of Visualization Along With Interior Design And Land Development Presented With, Among Others, 4 Different Shots, In The Number Of Shots In Accordance With The Offer (Min. 3 Copies);I) Preparation Of The Technical Spec
|