Screed Works – Sv-Cmü-250120-003 - Etf-A_New Construction Of A Workshop With Office Building And Storage Areas, Screed Work. Screed Work: Head Construction Component: Quick Cement Screed Screed On Insulation Layer - C40 F6 D 76Mm - 1261 M², Quick Cement Screed Screed On Insulation Layer - C40 F6 D 88Mm - 583 M², Quick Cement Screed Screed On Insulation Layer - C35 F5 D 54Mm - 118M², Quick Cement Screed Screed On Insulation Layer - C35 F5 D 95Mm - 220 M², Quick Cement Screed Screed On Insulation Layer - C35 F5 D 85Mm - 235 M²; Impact Sound Insulation Layer Mineral Wool 30-3Mm 30Mn/M3 0.035W/(Mk) Des –1716 M², Impact Sound Insulation Layer Mineral Wool 30-2Mm 30Mn/M3 0.035W/(Mk) Des – 583 M², Impact Sound Insulation Layer Mineral Wool 40-2Mm 30Mn/M3 0.035W/( Mk) Des – 118 M²; Vacuum The Surface With Shot Blasting, Concrete D 2Mm – 830 M², Flowable Mortar, D 10 Mm – 830 M²; Component Of The Workshop: Subsurface Shot Blasting Concrete D 2Mm - 2121 M², Subsurface Shot Blasting Concrete D 1Mm - 685 M², Quick Cement Screed Composite Screed C40 F6 D 88Mm - 590 M², Quick Cement Screed Composite Screed C40 F6 D 92Mm - 95 M², Leveling/Leveling The Subsurface, Flowable Mortar, D 20 Mm - 1481 M², Level/Level The Substrate, Flowing Mortar, D 5 Mm - 422 M²; Quick Cement Screed Screed On Insulation Layer - C40 F6 D 76Mm - 364 M², Quick Cement Screed Screed On Insulation Layer - C40 F6 D 70Mm - 19 M², Quick Cement Screed Screed On Insulation Layer - C40 F6 D 100Mm - 53 M²; Impact Sound Insulation Layer Mineral Wool 30-3Mm 30Mn/M3 0.035W/(Mk) Des – 383 M²;
Contact Information
Address
Emmy-Noether-Straße 2
Contact No.
+49 89 23614802
Email
Marr.Katrin@swm.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 91469077
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.