Building Construction Work – Technical-Economic Documentation Preparation Services For The Pac, Poe, Pt, Dde Phases, Technical-Economic Documentation Verification Services For The Pac, Poe, Pt, Dde Phases And Technical Assistance Services From The Designer And Execution Of Works For The Objective Of Investments Valea Bargaului Rural School Consortium. Technical-Economic Documentation Preparation Services Pac, Poe, Pt, Dde Phases, Technical-Economic Documentation Verification Services Pac, Poe, Pt, Dde Phases And Technical Assistance Services From The Designer And Works Execution) For The Investment Objective Valea Bargaului Rural School Consortium. The Value Estimate Was Applied By Reporting To Each Individual Project, In Accordance With The Provisions Of Art. 17 Para. (2), (3) And (4) Of Hg No. 395/2016 - By Adding The Estimated Value Of The Works Without Vat With The Estimated Value Related To Technical Design Services And Assistance From The Designer Without Vat And With The Value Related To Miscellaneous And Unforeseen Expenses, Without Vat, The Value Of 31,156,692.83 Lei Results, Without Vat, Value That Is Higher Than The Corresponding Thresholds Provided For In Art. 7 Para. (1) Letter A) From Law No. 98/2016 On Public Procurement, Respectively It Is Higher Than The Value Threshold Of 27,334,460 Lei For Public Works Procurement Contracts. - The Estimated Value For Choosing The Procedure Is: The Estimated Value Of The Works Contract Is Equal To 30,981,827.85 Lei Without Vat, To Which Is Added The Value Of Miscellaneous And Unforeseen Expenses In The Amount Of 174,864.98 Lei. Head. Budget Name Of Budget Chapter Value Lei Without Vat 3.5.4. The Technical Documentation Necessary To Obtain The Approvals/Agreements/Authorizations 423,000.00 3.5.6. Technical Project And Execution Details 1,148,500.00 3.8.1.1. Technical Assistance From The Designer - During The Execution Of The Works 56,000.00 3.8.1.2. Technical Assistance From The Designer - For The Designers Participation In The Phases Included In The Execution Works Control Program, Approved By The State Construction Inspectorate 28,200.00 1.3. Arrangements For The Protection Of The Environment And Bringing The Land To Its Initial State 1,045,000.00 2 Expenses For The Provision Of Utilities Necessary For The Investment Objective 154,000.00 4.1 Constructions And Installations 25,446,262.34 4.2. Assembly Of Machinery, Technological And Functional Equipment 129,816.61 4.3. Machinery, Technological And Functional Equipment That Requires Assembly 2,168,178.02 5.1.1 Site Organization - Construction Works And Installations Related To Site Organization 300,070.88 5.1.2 Site Organization - Expenses Related To Site Organization 82,800.00 Total 31,171. 827.85 The Term Until Which Bidders Can Request Clarifications Before The Deadline For Submitting Bids: 25 Days. The Contracting Authority Will Respond To All Requests For Clarification/Additional Information On The 15Th Day Before The Deadline For Submission Of Offers.
|