Supply And Installation Of Two New Lifts At The Punjab State Co-Operative Bank Ltd., Sco 175-187, Sector-34-A, Chandigarh. Supply And Installation Of Two New Lifts At The Punjab State Co-Operative Bank Ltd., Sco 175-187, Sector-34-A, Chandigarh. , Surface Pvc Conduit Pipe Wiring System With Modular Switches:Wiring In Pvc Insulated Copper Conductor Single Core Fr Cable (Isi Marked) Overall 1.5Sq. Mm, 1100Volts Grade To Be Laid In Heavy Gauge Pvc Conduit Pipe 20Mm/ 25Mm Dia (Isi Marked) Installed On Surface Etc., Complete With Pvc Boxes (Plastic On Surface Boxes) Required For Suitable Number Of Modules (Modular Accessories) For Having Step Type Electronic Fan Regulators (Two Module) 100Watts, Bell Push,6Amp. 2/3 Universal Socket (Shuttered), 16/20Amp. Combined/ Universal Socket (Shuttered), 6/10Amp. Switches, 16/20Amp. Switches With Indicator Etc. And Covered With Frame Plate Etc., Pvc Connector (For Fan Box And Call Bell), Ms Saddle Clamp, Pvc Circular Junction Boxes (Four Way 1½ Deep For Walls), Bonding To Earth With Pvc Insulated Copper Conductor Single Core Fr Cable (Isi Marked) 1Sq. Mm, 1100Volts Grade (For 6Amp. Wall Socket & Plug Control Point)And Other Petty Material Etc., Including The Cost Of Above Material And Painting As Required:- , Wiring Light Point , Wiring 6Amp. Wall Socket Point , Wiring Light Point Without Control Switch. , Copper Earthing:8 Swg Copper Earthing :Earthing With 8 Swg (4Mm Dia.) Electrolytic Copper Wire Thimbled (1No. Copper Thimble With Suitable Size Steel Bolt, Washers & Double Nut) With 30Cm X 60Cm X 2Mm Thick Copper Plate (Made Cylindrical) Burried Below Ground Level In The Hole Of Excavation Having Bore Dia. 125Mm And Surrounded By Salt & Charcoal Dust Mixture (20 Kg.) Including Fixing The Copper Wire Run Through 20Mm Dia. G.I. Pipe (A-Class) Recessed In Wall And In Floor Etc., Up To Suitable Length In Metre (Including Bore Length). G.I. Pipe 20Mm Dia. (A-Class) Of Suitable Length Should Be Laid In The Hole Of Excavation 1 Feet Below Ground Level And Having Gi Reducer 50Mm X 20Mm With Pvc Cap (For Pouring Water) Fixed On The Top Level Of The Pipe. 300Mm X 300Mm X 300Mm Deep Haudi Of First Class Bricks Finished With 1:4 Cement Plaster And Haudi Covered With Cast Iron Lid Having Size 300Mm X 300Mm (Heavy) Around The Hole Of Excavation:- , Earthing With 8 Swg (4Mm Dia.) Copper Wire Thimbled With 30Cm X 60Cm X 2Mm Thick Copper Plate Burried 4.50 Metre (14.76 Feet) Below Ground Level (Up To 8Metre In Length) With G.I. Pipe 20Mm Dia. (A-Class), 3Metre Long , Fixing Additional Length Of Earthing With 8 S.W.G. (4Mm Dia.) Copper Wire In G.I. Pipe With Sockets, Elbows, Steel Hooks And Gi Saddle Clamps Including Painting Etc.:- , Additional Length Copper Wire 8 S.W.G. (4Mm Dia.) In 20Mm Dia. G.I. Pipe (On Surface) , Xlpe Insulated Armoured Cables (On Surface):Supply, Laying And Erection Of Aluminium Conductor Xlpe Insulated Pvc Sheathed Armoured And Served Cable 1100 Volts Grade As Per Is:7098 (Part-1)1988 To Be Laid (On Surface) As Per Pwd General Specifications:- , Overall Size 25Sq.Mm (3½ Core) Armoured (On-Surface) , Miniature Circuit Breakers:Supply And Erection Of Miniature Circuit Breaker Mcbs For Circuit Protection Against Overload And Short Circuit Current Fault Suitable For 240/ 415 Volts 50Cycles Ac Supply With Breaking Capacity Of 10Ka, Curve-C And Low Watt Losses As Per Is/Iec 60898-1, Energy Limitation Class-3, True Contact Indication, Label Holder Facility In The Existing Mcb Distribution Board As Per Pwd General Specificationsincluding Connections With Suitable Size Of Thimbles/Lugs:- , Mcb Double Pole 6-32Amp. (10Ka, Curve-C) , Mcb Four Pole 50, 63Amp. (10Ka, Curve-C) , Mccbs (For Panels & Sheet Enclosure):Supply And Erection Of Moulded Case Circuit Breaker (Panel Mounting Cubical Type) In The Existing Cubical Panel (Confirm To Iec:60947-2) Having Ics=100% Icu, 100% Neutral With Spreader Terminal Links, Extended Rotary Handle And Relevantpwd General Specifications Complete With G.I. Bolts, Nuts & Connection On Both Sides Of Mccb With Suitable Size Of Thimbles Etc:- , Mccb Four Pole 63/80/100Amp., 415Volts, =25Ka Fixed Magnetic And Adjustable Thermal Setting , Sheet Metal Double Door Distribution Board For Mcbs/ Rcbos/ Rccbs:Supply And Erection Of Sheet Metal Double Door Distribution Boards Ip 43-Ik09 Metal Door (Dust Protected) As Per Is 8623-1&3, Iec 61439-1&3 Suitable For Flush Mounting With Fully Insulated Copper Busbars, Shrouded Neutral Bars, Earth Bars, Cement Spill Protector, Color-Coded Interconnecting Wire Set, Cable Ties, Blanking Plates And Circuit Identifications Label And Of Required No. Of Ways For Mountingminiature Circuit Breakers/ Rcbos/ Rccbs In The Distribution Board (For Sp&Ndistribution Board With Provision Dp Mcbs/ Rccbs/ Rcbos As Incomer And Sp Mcbs As Outgoings And For Tp&Nhorizontal Distribution Board With Provision Tpn/ Fp Mcbs/ Rccbs/ Rcbos As Incomer And Sp Mcbs As Outgoings) As Per Pwd General Specifications Including Connections With Suitable Size Of Thimbles And Bonding To Existing Earth Etc:- , Tp&N Horizontal Double Door Distribution Board 4 Way Each , Supply, Installation, Testing And Commissioning Of 10 Passengers, Assembled Product Passenger Elevator Capacity 10 Persons, 680 Kg Speed 1.00 M/S Stops & Openings 6 Stops, 6 Openings Floor Designations B,G,1,2,3, & 4Machine Room Less - Gearless Machine Located In The Shaft On Top Of The Guiderails Control Simplex Collective Selective Control Drive Acvvvf Power Supply 415 Volts, 3 Phase, 50Hz, Ac Hoist Way Dimensions 1975Mm Wide X 1975Mm Deep Car Travel 20000Mm Overhead 4200Mm Pit Depth 1530Mm Car Dimensions 1100 Mm Wide X 1600Mm Deep X 2200Mm High Door Opening 800Mm Wide X 2000Mm High Car Door 2 Panel Automatic Center Opening Door With Acvf Drive In Stainless Steel Silver Sky Finish Landing Door (Group1) 2 Panel Automatic Center Opening Door In Stainless Steel Silver Sky Finish On 6 Floors Note:- The Lift Should Compliens With All Conditions/Reqruirements As Per Hormonised Guidelines As Per Harmonised Guidelines And Space Standards For Barrier Free Built Environment Persons With Disability And Elderly Persons Issued By Govt. Of Indiaministry Of Urban Development. Serial No.7, Lifts 7.4 Or Any Latest Ammendments Relating To Lifts Which Ever Is Applicable. , Car Entrance: Center Opening Automatic Doors In Stainless Steel Panels In Hairline Finish Scratch Resistance/ Vandal Proof With Vision Panel (Upto 40% Area Should Be Visible By Glass) Having A Clear Opening Of 900Mm (Wide) X 2000Mm (High) And Contrasting In Colour From The Adjoining Wall.There Should Be No Difference In Level Between The Lift Door And The Floor Surface At Each Level. The Gap Between The Lift Door And Building Floor Should Not Be More Than 12 Mm. Hoist Way Entrance: Ground To Second Panel Center Opening Automatic Doors Of Stainless Steel Finish Panel In Scratch Resistance/ Vandal Proof With Provision Of Emergency Key Opening At Landings With A Clear Opening Of 800Mm (Wide) X 2000Mm (High) Door Operation : Automatic Dc Door Operation With Adjustable Door Opening And Closing Timings Control: Simplex Full Selective Collective Control With And Without Attentdent Operation: Automatic Power Supply: 415 Volts, 3- Phase, 50Hz Alternating Current Flooring: Floor Skid - Resistant As Per Standard Fan: Blower Fan In Car For Ventilation With Auto Cut Off Lighting: Led For Car Lighting Indicators: Led Dot Matrix / Digital 3 Segement Direction And Position Indicators In The Car And At All Landings Hand Rail: Stainless Steel Round Hand Rail Not Less Than 600Mm Long At 900Mm Above Floor Level (Side Lh,Side Rh & Rear) Call Button Height: Call Button (Outside The Lift) Placed At A Height Between 800Mm-1Meter From The Floor Level And Have A Clear Floor Space Minimum 900Mmx1200mm Control Panel Height: Control Panel Placed At A Height Between 800Mm-1Meter From The Floor Level With No Obstruction Placed To Prevent A Wheelchair User From Reaching It And Have Buttons With Braille/Raised Letters And In Sharp Contrast From The Background To Aid People With Visual Impairments , Audio And Visual Indicators: The Lift Should Have A Voice Announcement System Along With A Visual Displayto Indicate The Floor Level And Also The Information That The Door Of The Cage Is Open Or Closed For Enterence Or Exit.The Announcement System Should Be Clearly Audible.E. The Announcement Should Be 50 Decibel. Free Service One Years After The S/I/T/C Work And All Std. Govt. Features, Basic/ Minor Civil Work, Scaffolding, Pit Ladder. Other Features : 1. Battery Operated Emergency Light With Rechargeable Battery 2. Battery Operated Emergency Alarm With Rechargeable Battery 3. Adjustable Guide Shoes 4. Micro Movement Led Based Buttons 5. Door Open And Close Buttons 6. Emergency Intercom Provided Inside The Elevator 7. Emergency Intercom Usable Without The Voice Communication 8. Load Weighing Device With Overload Bypass Feature And Overload Function With Audio Visual Indication 9. Steel Items, Door Frames Sill Angles, Fascia Plates, Spring Buffers 10. Automatic Phase Reversal Device And Phase Failure Protection 11. Call Registration 12. Audio & Video System Installted In The Lift Indicating Arrival At A Floor 13. Manual Break Lever 14. Additional Car Gate Lock 15. Automatic Break Testing Infrared Safety Curten 16. Braille Buttons (Inside And Outside) With Braille Instructions For The Communication System 17. Kick Plate/Skirting 18. Lift Anoucement System To Announce Floor Levels In English Language Only And Indication Of Door For Entrance / Exit Is Either Open Or Close. 19. Car Operating Panel 20. Car Plateform Constructed Out Of Cold Rolled Grain Oreinted Formed Sheets Of Steel 21. Phase Two Device Fire Man Drive 22. Fire Man Switch At Main Lobby 23. Car False Ceiling In Stainless Steel 24. Pit Ladder25. Anti Nuisance Car Call Protection , 26. Door Nudging 27. Automated Resuce Device To Bring The Elevator To The Nearest Landing In Case Of Power Failure. 28The Use Of Visually And Acoustically Reflective Wall Surfaces Should Be Minimized Within The Lift Car As Visual Reflections Can Cause Discomfort And Affect The Visual Acuity Of People With Impairments. 29The Floor Of The Lift Car Should Be Slip Resistant And Have Similar Frictional Qualitites To The Floor Of The Lift Landing To Decrease The Risk Of Stumbling. 30The Provision Of A Mirror On The Wall Of The Lift Car Opposite The Lift Door Is A Positive Aid To Navigation For Wheelchair Users. It Allows The Wheelchair User To See If Anyone Is Behind Them And Also To See The Floor Indicator Panel. The Mirror Should Not Extend Below 900 Mm From The Lift Door To Avoid Confusing People With Impaired Sight. 31The Emergency Communication System Should Be Coupled With An Induction Loop System Installed All Around The Lift. Telephone Units, Where Provided, Should Have An Inbuilt Inductive Coupler To Assist Persons Using Hearing Aids. 10 Passenger Lift To Be Provided, Which Allows Easy Manoeuvrability Of Wheelchair User. , Supply & Erection Of 10-12 W Led Outdoor Bulk Head Fixture Water Proof Body, Ip 65 Protection With Inbuilt Constant Current Driver,. Complete In All Respect As Desired By The Engineer In Charge Of Work At Site.The Certification And Specification Of The Led Fitting Should Be As Approved By Office Advisor Technical Govt. Of Punjab Vide Letter No. At2021 Gl 1410-1422 Dated 06-05-2021. Beside This The Lighting Fixtures Manufacturer Should Have In House Accredited Lab. , Note:- The Cost Of Buy Back Material Will Be Deducted From Bill After Adding The Less Percentage Quoted By Firm*A% As Premium Is 80,000/-+ 80,000/- * A% , Add Charges For The Dismantling The Lift 40000 X 2 , Add Charges For The Dismantling The Lift 40000 X 2
|