Part 1. Installation Of Lighting On The Side Pitch Of The Sports Stadium In The Town Of Iłowo-Osada.1) The Scope Of Works In Question Includes Works Related To The Installation Of Lighting On The Side Pitch Of The Sports Stadium In The Town Of Iłowo-Osada - As Part Of The Task Entitled: Expansion Of Street Lighting In The Commune Of Iłowo-Osada And Lighting On The Side Pitch Of The Sports Stadium In The Town Of Iłowo-Osada. Investment Located: Ul. Akacja, Plot Number: 1037/8; Registry District: 0004 Iłowo-Osada, Poviat Działdowski. Works Carried Out On The Basis Of The Notification Of Construction Works Under The Above-Mentioned Task Carried Out On A Lump Sum Basis In The Scope Of: • Execution Of Lighting Power Supply: - Manual Digging Of Trenches For Cables, Bottom Width Up To 0.4 M, Soil Category Iii, Trench Depth Up To 0.8 M - 350 M; - Filling A Layer Of Sand At The Bottom Of The Cable Trench, Width Up To 0.4 M – 350 M;- Laying The Fezn Flat Bar In Cable Trenches, Hoop Cross-Section Up To 120 Mm2 – 350 M;- Laying Protective Pipes Made Of Dvk In The Trench (Pipe Up To Fi75 Mm R = 0.955 M = 1.000 S = 1.000) – 1 M;- Laying Protective Pipes Made Of Pvc In The Trench (Pipe Up To Fi50 Mm R = 0.955 M = 1,000 S = 1,000) – 350 M;- Laying Cables In Pipes, Hollow Bricks Or Closed Channels (Cable Up To 1.0Kg/M Cable Yakxs 0.6/1Kv 4X25mm2 Se) – 400 M;- Dry Processing Of Cables With Voltage Up To 1Kv With Plastic Insulation And Sheath (Cable 4-Wire, Up To 50 Mm2) – 6 Pcs;- Manual Backfilling Of Cable Trenches, Trench Bottom Width Up To 0.4˙M, Soil Category Iii, Trench Depth Up To 0.8 M - 350 M;- Boxes And Box Switchboards With Structure And Mounting Plate, Fastening By Screwing With Equipment Acc. Design, Weight Up To 20 Kg - 1 Set; - Tests And Measurements Of The Grounding, Lightning Protection And Zeroing Effectiveness Installations, Protective Or Working Earthing, First Measurement - 1 Piece; - Tests And Measurements Of The Grounding, Lightning Protection And Zeroing Effectiveness Installations, Protective Or Working Earthing, Each Next Measurement - 6 Pcs;• Installation Of Poles And Fixtures - Assembly And Erection (Mast Mal 14 With W550x95 Anodized Inox Anodized, Graphite, Protected With Polyurethane Elastomer) - 6 Pcs; - Installation Of The Boom (Aluminum Wm1-0.8 160X80x5 Zp Wzm Anodized Inox) - 6 Pcs; - Installation Of Cables For Lighting Fixtures, Pulled Into Poles, Casing Pipes And Booms, Height Of Lanterns Up To 12˙M, Cable Wires - 56 Set;- Dry Processing Of Cables With Voltage Up To 1Kv With Plastic Insulation And Sheath (3-Core Cable, Up To 16 Mm2) - 6 Pcs;- Installation Of Outdoor Lighting Fixtures (Bcgt-740 Edtdd Ipw D Ikw Fixture With Bg Mounting Power Supply Accessory According To Pt) - 6 Pcs; - Copper-Plated Profiled Steel Earth Electrodes (Impact Method), Category Iii Soil, 3˙M Earth Electrode, With A Power Generator - 3 Sets; - Surveying Service, Staking Out, Inventory - 1 Set. The Detailed Scope Of The Order Is Specified In The Design Do
|