1. The Subject Of The Order Includes: 1) Preparatory Work And Disassembly And Reassembly Of The Pitch Equipment, 2) Demolition Of The Existing Synthetic Plastic Surface, 3) Disposal Of Waste Polyurethane Surfaces, 4) Cleaning Of The Surface, 5) Sealing Of Expansion Joints With Mass, 6) Spray Priming,7) Construction Of The Surface In The 2S System (Sbr+Epdm) With A Total Thickness Of 16 Mm,8) Painting The Pitch Lines In Accordance With With The Project,9) Disassembly And Assembly Of New Grandstand Seats.3. Due To The Work Being Performed During School Hours Of The Primary School In Mroczno, The Contractor Is Obliged To Coordinate All Work With The Head Of The Unit So As Not To Pose A Threat To Safety And Its Operation.4. The Subject Of The Order Must Be Performed In Accordance With The Developed Design Documentation. 5. The Scope Of Works Was Included In The Bills Of Quantities, Which Constitute Part Of This Procedure Documentation And Constitute An Element For Calculating The Final Offer Price. The Contractor Cannot Correct The Scope Of Works Included In The Bill Of Quantities. However, If, As A Result Of His Analysis And Calculations, He Notices Any Irregularities, He May Seek Clarification Of Any Doubts Through The Question Procedure, In Accordance With Art. 284 Pzp.6. If Any Deficiencies, Defects Or Contradictions Are Found In The Materials Provided By The Ordering Party For The Preparation Of The Offer Cost Estimate, The Contractor Should Immediately Notify The Ordering Party Of This Fact Before The Deadline For Submitting Offers.7. The Contractor Is Responsible For The Protection Of Installations And Devices Located In The Multi-Purpose Sports Field And On The Plot In Question. The Contractor Will Ensure Proper Marking And Protection Against Damage To These Installations And Devices During Construction. The Contractor Will Be Responsible For Any Damage To Above-Ground Installations And Underground Facilities Caused By Him.8. The Contractor Shall Be Aware Of All Regulations Issued By Central And Local Authorities And Other Regulations And Guidelines Which Are In Any Way Related To The Works And Shall Be Fully Responsible For Compliance With Such Laws, Regulations And Guidelines While Carrying Out The Works.9. All Relevant Materials Obtained At The Construction Site Will Be Used Or Transported To Storage In Accordance With The Requirements Of The Contract Or The Ordering Partys Instructions.10. The Contractor Is Responsible For The Quality Of The Materials Used And The Works Performed And For Their Compliance With The Design Documentation.11. The Contractors Obligations Include In Particular: 1) Performing The Activities Listed In Art. 22 And 45A Of The Construction Law (If Applicable), 2) Land Development And Its Protection, 3) Quality Control Of Materials And Works In Accordance With The Provisions Of The Design Documentation And Stwiorb, 4) Completing And Presenting To The Ordering Party Documents Allowing For The Assessment Of The Correct
Contact Information
Address
Gmina Grodziczno,Grodziczno,13-324,Warmińsko-Mazurskie,Pl621 - Elbląski
Contact No.
564729710
Email
benia@grodziczno.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 91363193
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.