1. The Subject Of The Order Is The Execution Of The Task Titled: Construction Of A Sanitary Sewage System And A Container Sewage Treatment Plant In The City. Kocibórz. The Task Involves The Construction Of A Sanitary Sewage System And A Container Sewage Treatment Plant With An Electricity Connection And Hardening The Area On Plots No. 9/16; 202; 18/3; 18/14; 18/8; 236 Precinct 0014 Robawy, Reszel Commune In Kocibórz. The Scope Of The Construction Project Includes The Construction Of A Sanitary Sewage System With Sewage Discharge After Treatment In A Container Sewage Treatment Plant To A Watercourse - The Sajna River. The Sewage Treatment Plant Is A Complex Of Underground Facilities With Inter-Facility Pipelines, Pre-Meter Power Supply, An Exit From The Municipal Road And An Internal Technical Road For The Operation And Maintenance Of The Underground Facilities Of The Treatment Plant. Due To The Differences In Altitude Of The Area, A Sanitary Sewage Network Was Designed In A Gravity-Pressure System With A Sewage Pumping Station Located At The Sewage Treatment Plant.2. A Detailed Description Of The Subject Of The Order Is Included In The Documents Describing The Subject Of The Order - Annex No. 8 To Swz.3. Common Procurement Vocabulary Cpv: Main Subject Of The Contract:45000000-7 - Construction Worksadditional Subject Of The Contract:45111200-0 - Works In The Field Of Site Preparation For Construction And Earthworks45231300-8 - Construction Works In The Scope Of Construction Of Waterworks And Sewage Pipelines4. Due To The Fact That The Contractors Remuneration Indicated In The Offer Will Be A Lump Sum, When Pricing The Offer, The Contractor Should Rely On The Scope Indicated In The Design Documentation And Stwiorb. The Bill Of Quantities Is Of An Auxiliary Nature. The Occurrence, During The Implementation Of The Contract, Of Works Not Included In The Bill Of Quantities Or Works In A Larger Quantity Than That Accepted In The Bill Of Quantities Will Not Entitle The Contractor To Demand Additional Remuneration - If These Works Were Included In The Design Documentation Or Stwiorb.5. Equivalent Solutions. In Each Case Of Using Standards, Technical Assessments, Technical Specifications And Technical Reference Systems Referred To In Art. 101 Section 1 Point 2 And Section 3 Of The Public Procurement Law, The Contractor Should Assume That Such A Reference Is Accompanied By The Words Or Equivalent. If References To Standards, European Technical Assessments, Approvals, Technical Specifications And Technical Reference Systems Are Used In The Design Documentation, The Ordering Party Allows Solutions Equivalent To Those Described. When Analyzing The Design Documentation, The Contractor Should Assume That Each Reference Used In The Design Documentation Is Accompanied By The Word Or Equivalent. If Trademarks Are Used In The Design Documentation Or Technical Specification For The Execution And Acceptance Of Works, It Means That They Are Provided As Examples And Onl
Contact Information
Address
Gmina Reszel,Reszel,11-440,Warmińsko-Mazurskie,Pl622 - Olsztyński
Email
przetargi@gminareszel.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 91363175
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.